Protocol Revision Requests 825-849
This section contains completed PRRs (approved, rejected or withdrawn).
Approved
| PRR827 | Find Transaction and Find ESI ID Functions on the MIS |
| PRR829 | Total Transmission Capacity Correction |
| PRR830 | Reactive Power Capability Requirement |
| PRR831 | Annual Transmission Congestion Rights (TCR) Auction Amount |
| PRR832 | Deletion of Schedule Control Error (SCE) Posting Requirement |
| PRR833 | Primary Frequency Response Requirement from Existing WGRs |
| PRR836 | Revised Minimum Ramp Rate for Balancing Energy Service Down to Comport with PRR803 |
| PRR837 | Load Used in RMR Studies |
| PRR839 | Revised Resource Category Generic Fuel Costs |
| PRR840 | Update Trading Hub Conversion for 2010 Congestion Zones |
| PRR841 | Revise Total ERCOT Wind Power Forecast (TEWPF) |
| PRR842 | Addition of Generic Startup Cost and Minimum Energy Cost for Diesel |
| PRR844 | Transmission and/or Distribution Service Provider (TDSP) Definition Revision |
| PRR845 | Definition for IDR Meters and Optional Removal of IDR Meters at a Premise Where an Advanced Meter Can be Provisioned |
| PRR846 | Deadlines for Initiating Alternative Dispute Resolution |
| PRR847 | Additional Exemptions for Uninstructed Resource Charge |
| PRR849 | Suspension of Annual CSC Determination |
Rejected
| PRR825 | Distributed Energy Resource Participation in Responsive Reserve Service Markets |
| PRR828 | Remove QSE SCE Performance Exemption for QSEs with only Uncontrollable Renewable Resources On-line |
| PRR835 | Reactive Capability Requirement |
| PRR848 | Allow ERCOT Option to Cancel RPRS Capacity Commitments |
Withdrawn
| PRR826 | Clarification of Resource Definitions and Resource Registration of Self-Serve Generators for Reliability Purposes |
| PRR834 | ERCOT Load Forecast Accuracy |
| PRR838 | Fast Response Distributed Energy Resource (DER) |
| PRR843 | Add Regional Planning Section to Protocols |