PRR842
| Title: |
Addition of Generic Startup Cost and Minimum Energy Cost for Diesel
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 01/19/2010
|
| Effective Date: |
02/01/2010
|
| Related Issue: |
NPRR204 |
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
01/19/2010
|
Board of Directors
|
To approve PRR842 as recommended by TAC in the 1/6/10 TAC Report.
|
Passed
|
|
|
|
01/06/2010
|
TAC
|
To recommend approval of PRR842 as recommended by PRS in the 12/17/09 PRS Recommendation Report.
|
Passed
|
0
|
0
|
|
12/17/2009
|
PRS
|
To recommend approval of PRR842 as submitted.
|
Passed
|
2 Consumer
|
3 Ind Gen, IREP, Muni
|
|
12/16/2009
|
PRS
|
To grant PRR842 Urgent status.
|
Passed
|
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
12/10/2009
|
| Sponsor: |
South Texas Electric Cooperative, Inc.
|
| Urgent: |
Yes
|
| Sections: |
6.8.2.1
|
| Description: |
This Protocol Revision Request (PRR) adds generic costs for the Diesel Resource Category, which also includes other gas-fired Resources (including reciprocating engines). This PRR makes the minimum energy costs for diesel consistent with what is currently in the Nodal Protocols.
|
| Reason: |
No generic costs currently exist for this Resource type.
|
-
(12/10/09, .doc, 96 KB)
-
(12/16/09, .xls, 46 KB)
-
(12/18/09, .DOC, 106 KB)
-
(12/18/09, .doc, 44.5 KB)
-
(12/21/09, .doc, 67 KB)
-
(01/07/10, .doc, 95.5 KB)
-
(01/19/10, .doc, 109.5 KB)