PRR839
| Title: |
Revised Resource Category Generic Fuel Costs
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 12/15/2009
|
| Effective Date: |
01/01/2010
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
12/15/2009
|
Board of Directors
|
To approve PRR839 as recommended by TAC in the 12/3/09 TAC Recommendation Report and as revised by the ERCOT Board.
|
Passed
|
|
|
|
12/03/2009
|
TAC
|
To recommend approval of PRR839 as recommended by PRS in the 11/19/09 PRS Recommendation Report.
|
Passed
|
3 Consumer
|
1 Ind Gen
|
|
11/19/2009
|
PRS
|
To recommend approval of PRR839 as amended by the 11/18/09 AEP Energy Partners comments and as revised by PRS.
|
Passed
|
0
|
2 Consumer, Municipal
|
|
11/19/2009
|
PRS
|
To reconsider PRR839.
|
Passed
|
0
|
0
|
|
11/19/2009
|
PRS
|
To recommend approval of PRR839 as amended by the 11/18/09 AEP Energy Partners comments.
|
Passed
|
0
|
2 Consumer, Municipal
|
|
|
PRS
|
To grant PRR839 Urgent status.
|
Passed
|
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
10/23/2009
|
| Sponsor: |
AEP Energy Partners
|
| Urgent: |
Yes
|
| Sections: |
6.8.2.1, 6.8.2.3
|
| Description: |
This Protocol Revision Request (PRR) revises the Resource Category Generic Fuel Cost (RCGFC) for Direct Current (DC) Tie with non-ERCOT Control Area and Block Load Transfer (BLT) Resources to synchronize with the Nodal Protocols and to allow cost recovery for supplying this service.
|
| Reason: |
During a declared Emergency Condition, ERCOT may order emergency energy imports over the DC Ties and/or BLTs from a non-ERCOT Control Area. Comision Federal de Electricidad (CFE) staff has communicated to both ERCOT and AEP that CFE has lost money several times this past year performing this reliability service for ERCOT. Laws governing CFE require that CFE not lose money on these types of transactions. The addition of verifiable cost recovery will ensure that CFE is not financially harmed for providing this service. This change is necessary so that ERCOT operators can continue to use emergency energy imports over the DC Ties and/or BLTs when system conditions warrant. The changes listed in this PRR are identical to the Nodal Protocol language revisions implemented by NPRR103, Settlement of Power Imported via DC Ties and Block Load Transfer Under a Declared Emergency Condition, which was approved by the ERCOT Board on April 15, 2008.
|
-
(10/23/09, .doc, 88 KB)
-
(10/28/09, .xls, 46 KB)
-
(11/04/09, .doc, 67 KB)
-
(11/04/09, .doc, 44.5 KB)
-
(11/09/09, .doc, 48.5 KB)
-
(11/18/09, .doc, 118 KB)
-
(11/20/09, .DOC, 155.5 KB)
-
(12/03/09, .doc, 177 KB)
-
(12/15/09, .doc, 178.5 KB)