PRR835
| Title: |
Reactive Capability Requirement
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Rejected
on 10/22/2009
|
| Date |
Gov Body |
Action Taken |
Next Steps |
|
10/22/2009
|
PRS
|
|
Rejected
|
|
|
10/02/2009
|
|
|
|
PRS for consideration.
|
|
|
|
|
|
PRS for initial language consideration.
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
10/22/2009
|
PRS
|
To reject PRR835.
|
Passed
|
10 (7 Independent Generators; 1 Independent Power Marketer; 1 Investor Owned Utility;1 Municipal)
|
4 (2 Independent Generators; 1 Investor Owned Utility; 1 Independent Power Marketer)
|
|
10/02/2009
|
|
To grant Urgent status to PRR835
|
Passed
|
1
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Rejected
|
| Date Posted: |
09/30/2009
|
| Sponsor: |
Peter Wybierala on behalf of NextEra Energy Resources
|
| Urgent: |
Yes
|
| Sections: |
2.1, 2.2, 6.5.7, 6.5.7.1, 6.5.7.4 (new), 6.7.6
|
| Description: |
This PRR clarifies the Reactive Power capability requirement for WGRs by specifying +/- 0.95 power factor criteria as the minimum requirement, and the Generation Resources Unit Reactive Limit (URL) criteria as the maximum requirement contingent upon a System Impact Study by the TSP.
|
| Reason: |
Clarification of requirements for Resources.
|
-
(09/30/09, .doc, 118 KB)
-
(10/02/09, .xls, 46.5 KB)
-
(10/08/09, .doc, 61 KB)
-
(10/14/09, .doc, 67 KB)
-
(10/26/09, .DOC, 127.5 KB)
-
(10/27/09, .xls, 110 KB)