PRR830
| Title: |
Reactive Power Capability Requirement
|
| Next Group: |
|
| Next Step: |
Appealed to PUCT on 12/22/09 - see Docket Numbers 37817, 37818, 37819, 37823, 37824 and 37827.
|
| Status: |
Approved
on 11/17/2009
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
11/17/2009
|
Board of Directors
|
To approve PRR830 as recommended by TAC in the 11/5/09 TAC Recommendation Report and rejected the NextEra Energy Resources appeal.
|
Passed
|
|
|
|
11/05/2009
|
TAC
|
To recommend approval of PRR830 as recommended by PRS in the 10/22/09 PRS Recommendation Report and as amended by the 10/29/09 ERCOT comments.
|
Passed
|
1 (Independent Generator)
|
6 (1 Investor Owned Utility; 1 Independent Generator; 2 Consumers; 2 Independent Power Marketers)
|
|
10/22/2009
|
PRS
|
To recommend approval of PRR830 as endorsed by ROS.
|
Passed
|
8 (7 Independent Generators; 1 Independent Power Marketer)
|
5 (2 Independent Generators; 1 Independent Power Marketer; 2 Investor Owned Utilities)
|
|
09/17/2009
|
PRS
|
To table PRR830 for one month and to encourage ROS to provide comments on PRR830.
|
|
0
|
0
|
|
09/10/2009
|
PRS
|
To grant Urgent status to PRR830.
|
Passed
|
0
|
0
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
09/08/2009
|
| Sponsor: |
ERCOT
|
| Urgent: |
Yes
|
| Sections: |
2.1, 2.2, 6.5.7, 6.5.7.1, 6.7.6
|
| Description: |
This PRR clarifies the Reactive Power capability requirement for all Generation Resources, including existing WGRs who are not able to meet the 0.95 lead/lag requirement with the Generation Resource’s Unit Reactive Limit (URL). WGRs that commenced operation on or after February 17, 2004, and have a signed Standard Generation Interconnection Agreement (SGIA) on or before November 1, 2009 may met the Reactive Power requirements through a combination of the WGR’s URL and/or automatically switchable static VAR capable devices and/or dynamic VAR capable devices.
|
| Reason: |
Clarification of Reactive Power capability requirements on a going-forward basis and path to compliance for certain WGRs that are not able to meet the 0.95 lead/lag requirement at the Point of Interconnection based on Generation Resource’s URL.
|
-
(09/08/09, .doc, 102.5 KB)
-
(09/08/09, .doc, 45 KB)
-
(09/08/09, .doc, 185.5 KB)
-
(09/10/09, .xls, 46 KB)
-
(09/15/09, .doc, 47.5 KB)
-
(09/22/09, .doc, 118 KB)
-
(09/28/09, .doc, 44 KB)
-
(10/07/09, .doc, 67 KB)
-
(10/08/09, .doc, 88.5 KB)
-
(10/08/09, .doc, 74 KB)
-
(10/19/09, .doc, 58 KB)
-
(10/19/09, .xls, 122.5 KB)
-
(10/21/09, .doc, 67.5 KB)
-
(10/22/09, .doc, 42.5 KB)
-
(10/22/09, .doc, 146 KB)
-
(10/28/09, .doc, 131 KB)
-
(10/23/09, .xls, 110.5 KB)
-
(10/26/09, .doc, 45 KB)
-
(10/28/09, .doc, 103 KB)
-
(10/29/09, .doc, 51.5 KB)
-
(10/29/09, .doc, 129.5 KB)
-
(10/30/09, .doc, 41.5 KB)
-
(11/02/09, .doc, 62 KB)
-
(11/03/09, .doc, 87 KB)
-
(11/03/09, .doc, 55.5 KB)
-
(11/04/09, .doc, 78.5 KB)
-
(11/06/09, .doc, 153.5 KB)
-
(11/06/09, .xls, 118 KB)
-
(11/09/09, .doc, 40 KB)
-
(11/10/09, .zip, 656.2 KB)
-
(11/10/09, .doc, 52.5 KB)
-
(11/10/09, .doc, 199 KB)
-
(11/10/09, .pdf, 1.1 MB)
-
(11/10/09, .zip, 440 KB)
-
(11/10/09, .doc, 43.5 KB)
-
(11/10/09, .doc, 38.5 KB)
-
(11/18/09, .zip, 93.8 KB)
-
(11/20/09, .ppt, 107.5 KB)
-
(11/20/09, .doc, 43.5 KB)
-
(11/20/09, .zip, 76.3 KB)
-
(11/20/09, .doc, 167.5 KB)
-
(11/20/09, .zip, 12.9 MB)