PRR826
| Title: |
Clarification of Resource Definitions and Resource Registration of Self-Serve Generators for Reliability Purposes
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Withdrawn
on 05/26/2010
|
| Related Issue: |
NPRR190 |
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Withdrawn
|
| Date Posted: |
07/24/2009
|
| Sponsor: |
ERCOT
|
| Urgent: |
No
|
| Sections: |
2.1, 2.2, 5.3, 5.4.2.1, 5.4.3, 5.9.3.1, 6.5.1.1, 8.1.1, 8.1.2, 8.1.3.2, 8.2.1, 8.2.3, 8.2.4, 8.2.5, 8.4.1, 8.4.3, 8.4.7, 8.8.2, 16.5, 16.5.1, 16.5.2, 16.5.2.2
|
| Description: |
This Protocol Revision Request (PRR) adds language to acknowledge the existence of Generation Resources that have no or minimal injection onto the ERCOT System that qualify either as distributed generation or are registered with the Public Utility Commission of Texas (PUCT) according to P.U.C. Subst. R. 25.109, Registration of Power Generation Companies and Self-Generators, as a self-generator but yet are required to participate with ERCOT for reliability purposes.
|
| Reason: |
To clarify Protocol language requiring Generation Resources that do not normally inject power onto the ERCOT System and that qualify either as distributed generation or are registered with the PUCT according to P.U.C. Subst. R. 25.109, Registration of Power Generation Companies and Self-Generators, as a self-generator to participate in system operations and reliability planning with ERCOT for reliability purposes.
|
-
(07/30/09, .doc, 145.5 KB)
-
(07/24/09, .doc, 160 KB)
-
(07/24/09, .doc, 44 KB)
-
(08/26/09, .DOC, 39 KB)
-
(08/27/09, .doc, 161.5 KB)
-
(09/15/09, .doc, 39 KB)
-
(09/21/09, .DOC, 163.5 KB)
-
(10/26/09, .doc, 141.5 KB)
-
(11/23/09, .doc, 142.5 KB)
-
(12/18/09, .doc, 143 KB)
-
(05/26/10, .doc, 37 KB)