PRR812
| Title: |
Wind Generator Forecast Scheduling (formerly “Wind Generator Forecast for Scheduling Metric”)
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 09/15/2009
|
| Effective Date: |
10/01/2009
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
09/15/2009
|
Board of Directors
|
To approve PRR812 as recommended by TAC in the 8/6/09 TAC Recommendation Report.
|
Passed
|
|
|
|
08/06/2009
|
TAC
|
To recommend approval of PRR812 as amended by NEXTera Energy Resources comments and to direct TAC subcommittees to continue to follow this issue.
|
Passed
|
0
|
0
|
|
07/23/2009
|
PRS
|
To recommend approval of PRR812 as amended by Direct Energy comments and as revised by PRS.
|
Passed
|
1 IOU
|
1 Ind Gen
|
|
07/09/2009
|
TAC
|
To remand PRR812 to PRS to work out the issues identified by TAC and to bring back to TAC next month.
|
Passed
|
0
|
0
|
|
06/18/2009
|
PRS
|
To recommend approval of PRR812 as revised by PRS, with the recommendation to change “shall” to “may” and convey to TAC and the ERCOT Board that WMS and the QSE Managers Working Group (QMWG) recommended the metric with “shall” language, but that the ERCOT CEO has determined Nodal resource impacts with this language; and PRS requests that the ERCOT Board determine the priority of renewable energy metrics versus impacts to Nodal.
|
Passed
|
3 IOU, Ind Gen, IPM
|
0
|
|
05/21/2009
|
PRS
|
To recommend approval of PRR812 as amended by WMS comments.
|
Passed
|
3 Ind Gen (2), IREP (1)
|
4 IOU (1), Consumer (1), IREP (2)
|
|
05/21/2009
|
PRS
|
To reject PRR812.
|
Failed
|
9 Coop (2), Muni (2), IOU (1), Ind Gen (1), IREP (1), IPM (2)
|
5 IOU (1), Consumer (2), IREP (2)
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
04/24/2009
|
| Sponsor: |
Wind Coalition
|
| Urgent: |
No
|
| Sections: |
2.1, 2.2, 4.5.1, 4.5.10, 4.5.12 (new)
|
| Description: |
This Protocol Revision Request (PRR) specifies the process for Wind-powered Generation Resources (WGRs) to update Resource Plans and schedules every hour using the ERCOT provided most likely Short-Term Wind Power Forecast (STWPF) as the standard for accuracy. [Note - It is expected that AWS Truewind will be providing a forecast adjusted for turbine availability as a result of other pending Protocol changes.]
|
| Reason: |
Accurate Resource Plans and schedules provide ERCOT operations more certainty when deploying balancing and Resource specific Dispatch orders.
|
-
(04/24/09, .doc, 89 KB)
-
(05/19/09, .doc, 44.5 KB)
-
(05/22/09, .doc, 90 KB)
-
(05/21/09, .xls, 108 KB)
-
(05/21/09, .xls, 116 KB)
-
(06/17/09, .doc, 181.5 KB)
-
(06/17/09, .doc, 56.5 KB)
-
(06/19/09, .doc, 99 KB)
-
(06/19/09, .xls, 85.5 KB)
-
(07/01/09, .doc, 42 KB)
-
(07/01/09, .doc, 44 KB)
-
(07/06/09, .doc, 49 KB)
-
(07/10/09, .doc, 104.5 KB)
-
(07/27/09, .doc, 108.5 KB)
-
(08/03/09, .doc, 49 KB)
-
(08/07/09, .DOC, 112 KB)
-
(09/16/09, .doc, 99.5 KB)