Protocol Revision Requests 775-799
This section contains completed PRRs (approved, rejected or withdrawn).
Approved
| PRR775 | Change the name of Emergency Electric Curtailment Plan (EECP) to Energy Emergency Alert (EEA) |
| PRR776 | Automatic MCPE Adjustment During Intervals of Non-Spinning Reserve Service Deployment |
| PRR777 | WGR QSE Metric Correction |
| PRR778 | Clarification of Authorized Representative |
| PRR779 | Transparency for PSS and Full Interconnection Studies |
| PRR780 | Extending Black Start Service Bid Timeline |
| PRR781 | EILS Self-Provision Formula Correction and Clarifications |
| PRR782 | Clean-up and Corrections to Terminology and Transaction Timings in Protocol Section 15, Customer Registration |
| PRR783 | Elimination of the Non-ERCOT LSE Fee |
| PRR784 | Delete Use of Boundary Generation Resources to Resolve CRE Congestion |
| PRR785 | Timing for Required Black Start Unit Load Carrying Test. |
| PRR786 | Modifications to EILS Settlement |
| PRR787 | Add Non-Compliance Language to QSE Performance Standards (formerly “Add Violation Language to QSE Performance Standards”) |
| PRR788 | Ramp Rate Limits for Existing WGRs |
| PRR789 | Removal of Grey Box Language Related to Lagged Dynamics Load Profiling Due to Unfunded Projects |
| PRR790 | Load Profile ID Annual Validation Change Request |
| PRR792 | Revised Renewable Portfolio Standards Allocation Process, Pursuant to P.U.C. Subst. R. 25.173 |
| PRR793 | WGR QSE Scheduling Metric |
| PRR794 | Meteorological Data Required from QSEs Representing Wind-powered Generation Resources |
| PRR795 | 90-Day Transmission Outage Scheduling Timeline |
| PRR796 | Resource Plan Performance Metrics Revision |
| PRR797 | Removal of Reference to ERCOT Business Processes |
| PRR798 | Update Trading Hub Conversion |
| PRR799 | ERCOT CEO Approval of NPRRs and SCRs Prior to Posting on MIS |
Withdrawn
| PRR791 | Shortage Pricing Mechanism |