PRR779
| Title: |
Transparency for PSS and Full Interconnection Studies
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 01/20/2009
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
01/20/2009
|
Board of Directors
|
To approve PRR779 as recommended by TAC.
|
Passed
|
|
|
|
12/04/2008
|
TAC
|
To recommend approval of PRR779 as recommended by PRS.
|
Passed
|
|
|
|
11/20/2008
|
PRS
|
To endorse and forward the PRS Recommendation Report and Impact Analysis for PRR779 to TAC.
|
Passed
|
|
|
|
10/23/2008
|
PRS
|
To recommended approval of PRR779 as revised by PRS.
|
Passed
|
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
09/19/2008
|
| Sponsor: |
Marguerite Wagner/PSEG Texas
|
| Urgent: |
No
|
| Sections: |
1.3.1.1, Items Considered Protected Information 1.3.1.2, Items Not Considered Protected Information 12.2, ERCOT Obligation to Provide Information 12.3, Transmission-Related Information
|
| Description: |
Updates to Section 1 to provide transparency to status of Power System Stabilizer Equipment and interconnection requests.
|
| Reason: |
To provide additional information for ERCOT and Market Participants related to generation equipment that affects stability limits and information about potential generation interconnections at the time a full interconnection study is requested.
|
-
(09/22/08, .doc, 103 KB)
-
(10/16/08, .doc, 55.5 KB)
-
(10/21/08, .doc, 60 KB)
-
(10/22/08, .doc, 57.5 KB)
-
(10/23/08, .doc, 98.5 KB)
-
(10/23/08, .doc, 57 KB)
-
(11/19/08, .doc, 108 KB)
-
(11/12/08, .doc, 44.5 KB)
-
(11/24/08, .doc, 113.5 KB)
-
(12/05/08, .doc, 116 KB)
-
(01/22/09, .doc, 118 KB)