PRR771
| Title: |
Ramp Rate Limitation of 10% per minute of On-Line Installed Capability for Wind-powered Generation Resources
|
| Next Group: |
Board of Directors
|
| Next Step: |
ERCOT Board consideration of PRR771.
|
| Status: |
Pending
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
11/06/2008
|
TAC
|
To recommend approval of PRR771 as recommended by PRS.
|
Passed
|
1 IOU
|
0
|
|
10/23/2008
|
PRS
|
To endorse and forward the PRS Recommendation Report, as amended by FPL Energy comments dated 10/23/08 and as revised by PRS, and Impact Analysis for PRR771 to TAC.
|
Passed
|
1 IOU
|
0
|
|
09/24/2008
|
PRS
|
To recommend approval of PRR771 as amended by ERCOT comments.
|
Passed
|
2 IOU, Ind. Gen.
|
1 IPM
|
|
08/21/2008
|
PRS
|
To table PRR771.
|
Passed
|
0
|
0
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Pending
|
| Date Posted: |
07/25/2008
|
| Sponsor: |
ROS
|
| Urgent: |
No
|
| Sections: |
6.5.13(new), 6.6, 6.6.1
|
| Description: |
This Protocol Revision Request (PRR) proposes a requirement for Wind-powered Generation Resources (WGRs) to limit the ramp rate to 10% per minute of On-line installed capability.
|
| Reason: |
The intent of this PRR is to maintain system reliability as it allows ERCOT to avoid frequency spikes due to the WGRs ability to ramp up or ramp down almost instantaneously.
|
-
(07/25/08, .doc, 79.5 KB)
-
(08/04/08, .doc, 43 KB)
-
(08/06/08, .doc, 43.5 KB)
-
(08/18/08, .doc, 49 KB)
-
(08/26/08, .doc, 87 KB)
-
(09/11/08, .doc, 47 KB)
-
(09/16/08, .doc, 43 KB)
-
(09/18/08, .doc, 45 KB)
-
(09/19/08, .doc, 47 KB)
-
(09/23/08, .doc, 47 KB)
-
(09/29/08, .doc, 100 KB)
-
(10/23/08, .doc, 44.5 KB)
-
(10/23/08, .doc, 46 KB)
-
(10/27/08, .doc, 108.5 KB)
-
(11/10/08, .doc, 111 KB)