PRR748
| Title: |
Settlement During EDS 3 LFC Testing
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 01/15/2008
|
| Effective Date: |
02/01/2008
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
01/15/2008
|
Board of Directors
|
To approve this PRR as recommended by the TAC.
|
Passed
|
0
|
0
|
|
01/03/2008
|
TAC
|
To recommend approval of this PRR as recommended by PRS.
|
Passed
|
0
|
0
|
|
12/13/2007
|
PRS
|
To recommend approval of this PRR as submitted.
|
Passed
|
0
|
1 IPM
|
|
|
PRS
|
Grant request for Urgent status for PRR748.
|
Passed
|
0
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
12/10/2007
|
| Sponsor: |
Bill Barnes, ERCOT
|
| Urgent: |
Yes
|
| Sections: |
6.8.2.3, 7.4.3.1 and 7.4.3.2
|
| Description: |
This PRR modifies Out Of Merit Energy (OOME) and Local Balancing Energy (LBE) payment formulas for Early Deliver System (EDS) 3 R6.3 Load Frequency Control (LFC) (Total System) test. It also contains “clean up” items to correct terminology and capitalize terms that ought to be capitalized.
|
| Reason: |
EDS 3 R6.3 LFC Test is the total system test for Security Constrained Economic Dispatch (SCED). This test verifies that Qualified Scheduling Entities (QSEs) can follow ERCOT control requests for Generation Resources receiving Base Points, Updated Desired Generation and LFC Regulation. This PRR details how ERCOT will perform Settlements during these testing periods.
|
-
(12/07/07, .doc, 287.5 KB)
-
(12/07/07, .doc, 46 KB)
-
(12/12/07, .xls, 27 KB)
-
(12/14/07, .doc, 287 KB)
-
(01/03/08, .doc, 289 KB)
-
(01/15/08, .doc, 290.5 KB)