PRR673
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
11/14/2006
|
Board of Directors
|
Approve as recommended by TAC.
|
Passed
|
0
|
0
|
|
10/06/2006
|
TAC
|
Recommend approval of PRR673 as recommended by PRS.
|
Passed
|
0
|
0
|
|
08/17/2006
|
PRS
|
Recommend approval as revised by TXU and ERCOT comments, and as revised by PRS consistent with the August 10, 2006 ROS discussion.
|
Passed
|
|
3 1 MOU and 2 IREPs
|
|
07/19/2006
|
PRS
|
To grant urgent status via email vote.
|
Failed
|
1 IOU
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
07/14/2006
|
| Sponsor: |
Frequency Control Task Force
|
| Urgent: |
No
|
| Sections: |
6.10.12.1 SCE Performance Charge
|
| Description: |
The Scale Factor value in the SCE Performance Charge calculation is currently fixed at 1. This PRR would modify the Scale Factor monthly based on ERCOTā??s CPS_1 score. This PRR also sets maximum and minimum values for the Scale Factor.
|
| Reason: |
The Scale Factor is a mechanism placed in the SCE Performance Charge calculation to allow for simple revision of the formula if the performance charge created by PRR 661 is later deemed to be too severe or too lenient. When recommending approval of PRR 661 to the Board, TAC directed WMS to develop a PRR proposing a method to automatically adjust the Scale Factor, other than through repetitive Protocol Revision Requests.
|
-
(07/14/06, .doc, 77.5 KB)
-
(07/19/06, .doc, 75 KB)
-
(07/19/06, .xls, 22 KB)
-
(08/10/06, .doc, 48 KB)
-
(08/14/06, .doc, 53 KB)
-
(08/17/06, .doc, 57 KB)
-
(09/26/06, .doc, 92.5 KB)
-
(09/15/06, .doc, 43 KB)
-
(09/15/06, .xls, 145.5 KB)
-
(10/11/06, .doc, 99 KB)
-
(11/17/06, .doc, 96.5 KB)