PRR668
| Title: |
Distribution Loss Factor Calculations
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 09/19/2006
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
09/19/2006
|
Board of Directors
|
The ERCOT Board unanimously approved PRR668 as recommended by TAC.
|
Passed
|
|
|
|
08/03/2006
|
TAC
|
Recommend approval of PRR668, including rank and priority as recommended by PRS.
|
Passed
|
0
|
0
|
|
07/20/2006
|
PRS
|
Recommendation to assign a rank of 32.6 and priority of 1.1 on the 2006 Project Prioritization List (PPL) and a priority of 2 (high rank) on the 2007 PPL.
|
Passed
|
0
|
0
|
|
06/22/2006
|
PRS
|
Recommend approval as revised by TXU Electric Delivery comments
|
Passed
|
0
|
0
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
05/24/2006
|
| Sponsor: |
Unaccounted For Energy Task Force (UFETF)
|
| Urgent: |
No
|
| Sections: |
13.3
|
| Description: |
Modify the Settlement Interval Distribution Loss Factor (SILF) to better represent the non-linear relationship between the loss factor and Settlement Interval ERCOT System Load (SIEL).
|
| Reason: |
The current Distribution Loss Factor (DLF) formula assumes a straight line relationship between DLF and ERCOT system load, which results in mis-estimation of distribution losses in settlement. The proposed formula is non-linear and will better represent distribution losses.
|
-
(05/24/06, .doc, 90 KB)
-
(06/02/06, .doc, 83 KB)
-
(08/02/06, .doc, 95.5 KB)
-
(07/10/06, .doc, 50.5 KB)
-
(07/11/06, .xls, 140.5 KB)
-
(08/08/06, .doc, 98.5 KB)
-
(09/22/06, .doc, 98.5 KB)