PRR632
| Title: |
Clawback Mechanism for Generating Resources at a Site with an RMR Unit
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Rejected
on 02/23/2006
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
02/23/2006
|
PRS
|
Reject PRR632
|
Passed
|
0
|
0
|
|
01/18/2006
|
WMS
|
Recommend rejection
|
Passed
|
|
|
|
10/20/2005
|
PRS
|
Refer to WMS with isntructions to report back to PRS at the January PRS meeting
|
Passed
|
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Rejected
|
| Date Posted: |
09/09/2005
|
| Sponsor: |
TXU Energy
|
| Urgent: |
No
|
| Sections: |
2.1, 6.8.3.1
|
| Description: |
Establishes a Â?clawbackÂ? mechanism applicable to RMR Standby Cost to prevent improper subsidization of Generation Resources located at the same physical location as an RMR Unit. Such Resources are called Â?RMR Companion Unit(s).Â? The Â?clawbackÂ? mechanism reduces the hourly Standby Price paid for RMR Service by the Â?profitsÂ? earned by operation of any RMR Companion Units located at the same site as the RMR Unit up to the cumulative total hourly Standby Cost incurred. The Â?profitsÂ? of the RMR Companion Unit(s) are defined as the difference between the MCPE for each interval that the Companion Unit(s) operate and the Resource Category Generic Fuel Cost (RCGFC) for the Companion Unit(s) less the Resource Category Generic Start Cost of the RMR Resource if started during the period in which the RMR Companion Unit(s) operated.
|
| Reason: |
|
-
(09/09/05, .doc, 87.5 KB)
-
(09/26/05, .doc, 53.5 KB)
-
(10/31/05, .doc, 92.5 KB)
-
(10/31/05, .xls, 142 KB)
-
(01/18/06, .doc, 49 KB)
-
(02/28/06, .doc, 88.5 KB)