Protocol Revision Requests 525-549
This section contains completed PRRs (approved, rejected or withdrawn).
Approved
| PRR525 | SCE Performance and Monitoring |
| PRR526 | OOMC Verifiable Cost Documentation |
| PRR527 | Clarify OOM Definition |
| PRR528 | Deadline for Filing ADR Claims |
| PRR529 | Calculating Final REC Purchasing Requirements |
| PRR531 | Load Clarification |
| PRR532 | Implementation of Non-Transmission Alternatives to RMR and OOM Services |
| PRR534 | Temporary Modifications to the Annual Load Profile ID Assignment and Validation Process |
| PRR535 | Reactive Testing |
| PRR536 | Mandatory IDR Threshold Reduction |
| PRR537 | Increased Congestion Management Flexibility |
| PRR538 | OOMC Generic Cost for Coal |
| PRR540 | OOM Cost Recovery Process Clarification |
| PRR542 | Clarifying the LaaR Three Hour Limit |
| PRR543 | Schedules and Emergency Assistance Over CFE-ERCOT DC Ties |
| PRR544 | Twelve Month Window for Scaling NIDR to IDR ESI IDs |
| PRR545 | Retail Market Extracts |
| PRR546 | PCR Treatment for Federal Hydropower Resources |
| PRR547 | Trading Hubs |
Rejected
| PRR530 | Short Pay Uplift to LSEs |
| PRR541 | Regulation Deployment Ramp Rate |
| PRR548 | Settlement for Mismatched Inter-QSE Energy Schedules |
Withdrawn
| PRR533 | Definition of Transmission Facility Owner |
| PRR539 | OOMC Claw Back Correction |
| PRR549 | Regulation Control During Abnormal Frequency Events |