Protocol Revision Requests 500-524
This section contains completed PRRs (approved, rejected or withdrawn).
Approved
| PRR501 | A/S Revision to Down Balancing Requirement |
| PRR502 | Aggregation of Combined Cycle Units Providing RRS |
| PRR504 | Resource Derating Clarification |
| PRR507 | RMR Process enhancements |
| PRR509 | Initiation, Procedure, and Settlement of Disputes through ADR |
| PRR510 | Remove PIP134 and PIP158 Boxed Language |
| PRR512 | OOMC and OOME of LaaRs |
| PRR513 | Verification of Operational Model after Recurring Local Congestion Event |
| PRR514 | Twelve Month Window for Non-IDR Scaling |
| PRR515 | Disclosure of Local Congestion |
| PRR517 | Reduce the Number of Annual TCRs Sold to 40% from 60% |
| PRR518 | Clarification of Requirements Relating to Retail Transactions |
| PRR519 | ERCOT and TDSP Acceptance of Customer Cancellation of Switch Request |
| PRR520 | Resource Plan Performance Metrics |
| PRR521 | Add Fleet/Zonal OOME instruction to SCE Calculation |
| PRR522 | Collateral Requirements and Credit Changes |
| PRR523 | Revisions to Protocol Section 21 |
Rejected
| PRR508 | Date of Congestion Zone Changes |
Withdrawn
| PRR500 | OOME Down Payments - Verifiable Costs |
| PRR503 | Section 8 Coordination of Resource Outage Due to TSP |
| PRR505 | Elimination of OOME Down Payments |
| PRR506 | Revision to Short Payment Process |
| PRR511 | Clarification of PCR Eligibility |
| PRR516 | Curtailment Prioritization for Wind Generators Introduces the concept of using in-service date to determine curtailment priority in situations where only wind generators are needed to resolve local congestion |
| PRR524 | Clarification of Timeline for Cost Submission |