PRR399
| Title: |
IDR Replacement with Non-IDR Meter Requirements
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Withdrawn
on 07/02/2003
|
| Date |
Gov Body |
Action Taken |
Next Steps |
| |
| No Updates have been made to this issue. |
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
| |
| No Updates have been made to this issue. |
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Withdrawn
|
| Date Posted: |
04/15/2003
|
| Sponsor: |
Center Point Energy
|
| Urgent: |
Yes
|
| Sections: |
18.6.1 & 18.6.6
|
| Description: |
This revision allows 1) IDR installations where they are needed or required and provide the most effective utilization of this type of reporting to ERCOT; and 2) Removal of IDR installations that are no longer valid for a premise or ESI ID because of reduced load or consumption based upon 12-month consecutive usage data.
|
| Reason: |
|
-
(04/24/03, .doc, 57.5 KB)
-
(04/15/03, .doc, 86 KB)
-
(06/25/03, .doc, 71.5 KB)
-
(04/24/03, .doc, 61 KB)