PRR397
| Title: |
McCamey Area Congestion Management
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 06/17/2003
|
| Date |
Gov Body |
Action Taken |
Next Steps |
| |
| No Updates have been made to this issue. |
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
| |
| No Updates have been made to this issue. |
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
03/19/2003
|
| Sponsor: |
TXU Energy
|
| Urgent: |
No
|
| Sections: |
7.8 [new]; 7.8.1-10
|
| Description: |
This revision is designed to minimize uplifted congestion costs while attempting to reliably maximize the use of the transmission system in the McCamey area where numerous wind turbine generators are currently located and additional wind generators may be constructed.
|
| Reason: |
|
-
(04/22/04, .ppt, 44.5 KB)
-
(04/24/03, .doc, 68.5 KB)
-
(04/28/03, .doc, 91 KB)
-
(04/08/03, .doc, 61.5 KB)
-
(04/27/04, .doc, 67.5 KB)
-
(03/19/03, .doc, 97 KB)
-
(05/28/03, .doc, 98.5 KB)
-
(06/02/03, .doc, 97.5 KB)
-
(06/11/03, .doc, 112 KB)