PRR281
| Title: |
Allowance for Aggregated Site-Specific Resource Dispatch Instructions (v2)
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Withdrawn
on 08/21/2003
|
| Date |
Gov Body |
Action Taken |
Next Steps |
| |
| No Updates have been made to this issue. |
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
| |
| No Updates have been made to this issue. |
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Withdrawn
|
| Date Posted: |
05/24/2002
|
| Sponsor: |
Calpine
|
| Urgent: |
No
|
| Sections: |
various
|
| Description: |
This is version 2 of the original PRR submitted on 9/10/2001. This revision is intended to allow for site-specific dispatch of resources & would not be mandatory for all resource owners. V2 redefines sections of the Protocols where change is necessary & requests a Normal timeline for implementation. This PRR was originally entitled, Â?Change ERCOT Deployment Instructions to Settlement Meter SpecificÂ?. Due to the emergence of split metering, netting behind meters, & other factors the reference to instructions to the settlement meter was dropped in favor of the more accurate description of aggregated site-specific dispatch of resources.
|
| Reason: |
|
-
(12/11/02, .doc, 667.5 KB)
-
(12/11/02, .doc, 271.5 KB)
-
(12/11/02, .doc, 80 KB)
-
(12/11/02, .doc, 259.5 KB)
-
(08/26/03, .doc, 43 KB)