OGRR240
| Title: | CREZ Facility Protection and Control Requirements |
| Next Group: | |
| Next Step: | |
| Status: | Approved on 06/03/2010 |
| Date | Gov Body | Action Taken | Next Steps | |
|---|---|---|---|---|
| 06/03/2010 | TAC |
|
Approved | |
| 05/13/2010 | ROS |
|
Recommended for Approval | TAC Consideration |
| 03/11/2010 | ROS |
|
Referred | ROS Consideration |
| 02/19/2010 | OWG |
|
Referred | ROS Consideration |
| OWG Language Consideration | ||||
| Date | Gov Body | Motion | Result | Against | Abstentions |
|---|---|---|---|---|---|
| 06/03/2010 | TAC | To approve of OGRR240 as amended by the 6/2/10 Oncor comments and as revised by TAC | Passed | 0 | 0 |
| 05/13/2010 | ROS | To recommend approval of OGRR240 as amended by the 5/7/10 OGRR240/242 Task Force comments and as revised by ROS via roll call vote | Passed | ||
| 03/11/2010 | ROS | To refer OGRR240 to the OGRR240/242 Task Force. | Passed | 0 | 0 |
| 02/19/2010 | OWG | Consensus to recommend that ROS develop a cross-functional group with members from the System Protection Working Group (SPWG), Dynamics Working Group (DWG), Steady State Working Group (SSWG), Critical Infrastructure Protection Working Group (CIPWG), communications experts, and OWG with a direction to develop a solution for ROS to consider in April | |||
| To grant Urgent status | Passed |
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: | Approved |
| Date Posted: | 02/15/2010 |
| Sponsor: | American Electric Power Service Corporation (AEPSC) |
| Urgent: | Yes |
| Sections: | 7.2.2, 7.2.4, 7.2.5.1, 7.2.5.2, 7.2.5.3 |
| Description: | This OGRR provides more stringent protection and control requirements for all new CREZ 345 kV Facilities. |
| Reason: | This OGRR provides requirements for the protection and control for the CREZ transmission system that supports the transfer of renewable energy reliably from remote areas to large Load centers. This OGRR is aimed at achieving fault clearing within the voltage curve described in North American Electric Reliability Corporation (NERC) Draft Reliability Draft Standard PRC-024-01, Generator During Frequency and Voltage Excursions (http://www.nerc.com/docs/standards/sar/PRC-024-1_Draft1_2009Feb17.pdf). The proposed revisions also address new NERC Planning (http://www.nerc.com/filez/standards/Assess-Transmission-Future-Needs.html) and Protection (http://www.nerc.com/docs/standards/sar/Project2009-07_Tech_Paper_Reliability_of_Protection_Systems_2009Jan20.pdf)standards currently under consideration. Additional information has been provided in the subsequent 021510 AEPSC Comments for this OGRR. |
-
(02/15/10, .doc, 151 KB)
-
(02/15/10, .doc, 51 KB)
-
(02/17/10, .xls, 121 KB)
-
(02/23/10, .doc, 155.5 KB)
-
(03/04/10, .doc, 39 KB)
-
(03/04/10, .doc, 141.5 KB)
-
(03/09/10, .zip, 17.7 KB)
-
(03/12/10, .doc, 181 KB)
-
(05/07/10, .doc, 146 KB)
-
(05/12/10, .doc, 48.5 KB)
-
(05/17/10, .doc, 187.5 KB)
-
(05/17/10, .xls, 128.5 KB)
-
(05/17/10, .xls, 128.5 KB)
-
(05/26/10, .doc, 146.5 KB)
-
(05/26/10, .doc, 40 KB)
-
(05/26/10, .doc, 64.5 KB)
-
(05/26/10, .doc, 47 KB)
-
(06/02/10, .doc, 147.5 KB)
-
(06/07/10, .doc, 199 KB)