OGRR219
| Title: |
Time Error Correction
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 03/05/2009
|
| Effective Date: |
04/01/2009
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
03/05/2008
|
TAC
|
To approve OGRR219 as recommended by ROS.
|
Passed
|
0
|
0
|
|
02/12/2009
|
ROS
|
To recommend approval of OGRR219 as recommended by OWG.
|
Passed
|
0
|
0
|
|
02/09/2009
|
OWG
|
Consensus to recommend approval of OGRR219 as submitted.
|
Passed
|
|
|
|
|
|
To grant Urgent status.
|
Passed
|
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
02/04/2009
|
| Sponsor: |
ERCOT
|
| Urgent: |
Yes
|
| Sections: |
1.5
|
| Description: |
This Operating Guide Revision Request (OGRR) removes the requirement that ERCOT perform time error corrections for accumulated time errors exceeding five (5) seconds.
|
| Reason: |
The NERC Balancing Authority Controls Standard Drafting Team (BACSDT) is gathering field trial data to support the move to eliminating time error correction as it is not believed to be required for reliability purposes and therefore should not be a NERC standard. This OGRR allows ERCOT to maintain compliance with the Operating Guides while participating in the field trial.
|
-
(02/04/09, .doc, 96 KB)
-
(02/04/09, .doc, 44.5 KB)
-
(02/06/09, .xls, 110 KB)
-
(02/13/09, .doc, 97 KB)
-
(02/16/09, .doc, 102.5 KB)
-
(03/06/09, .doc, 109.5 KB)