OGRR211
| Title: |
Deletion of References to Back-to-Back Import Capacity
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 09/04/2008
|
| Effective Date: |
10/01/2008
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
09/04/2008
|
TAC
|
To approve OGRR211 as recommended by ROS.
|
Passed
|
0
|
0
|
|
08/14/2008
|
ROS
|
To recommend approval of OGRR211 as recommended by OWG.
|
Passed
|
0
|
0
|
|
07/16/2008
|
OWG
|
Consensus to forward the OWG Recommendation Report and the Impact Analysis for OGRR211 to the ROS for consideration.
|
Passed
|
|
|
|
06/18/2008
|
OWG
|
Consensus to recommend approval of OGRR211 as submitted.
|
Passed
|
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
05/22/2008
|
| Sponsor: |
ERCOT
|
| Urgent: |
No
|
| Sections: |
4.5.3.3
|
| Description: |
This OGRR deletes obsolete references to Back-to-Back (BtB) import capacity from the list of tasks ERCOT is responsible for under Emergency Electric Curtailment Plan (EECP) Step 1. It also replaces references to a “unit” in the EECP Steps with the defined term “Resource,” and makes minor language corrections consistent with previous revisions to the ERCOT Protocols made pursuant to PRR726, DC Tie Scheduling Clarifications, which became effective on October 1, 2007.
|
| Reason: |
To align the Operating Guides with the ERCOT Protocols by revising and deleting language previously removed from or revised in Protocol Section 5.6.7, EECP Steps, through PRR726.
|
-
(05/22/08, .doc, 126.5 KB)
-
(05/22/08, .doc, 44.5 KB)
-
(06/17/08, .doc, 40 KB)
-
(06/18/08, .doc, 107.5 KB)
-
(07/17/08, .doc, 126 KB)
-
(08/15/08, .doc, 128 KB)
-
(09/04/08, .doc, 147 KB)