OGRR208
| Title: |
Voltage Ride-Through (VRT) Requirement
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 10/02/2008
|
| Effective Date: |
11/01/2008
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
10/02/2008
|
TAC
|
To approve OGRR208 as recommended by ROS
|
Passed
|
3 IPM-2; Gen-1
|
3 IPM-1; IREP-1
|
|
09/11/2008
|
ROS
|
To recommend approval of OGRR208 as recommended by OWG and as revised by ROS
|
Passed
|
0
|
0
|
|
08/20/2008
|
OWG
|
Consensus to forward OGRR208 to ROS as amended by the 081908 OGRTF comments and as revised by OWG.
|
Passed
|
|
|
|
08/14/2008
|
ROS
|
To remand OGRR208 to OWG as revised by ROS with the directive that “grandfathering” and compliance issues be addressed.
|
Passed
|
0
|
0
|
|
07/16/2008
|
OWG
|
Consensus to forward the OWG Recommendation Report and the Preliminary Impact Analysis to the ROS for consideration.
|
Passed
|
|
|
|
06/18/2008
|
OWG
|
Consensus to recommend approval of OGRR208 as amended by the 061708 OGRTF comments and contingent upon resolution of the issues identified in the 061708 OGRTF comments by ROS.
|
Passed
|
|
|
|
05/21/2008
|
OWG
|
Consensus to defer action on OGRR208 as recommended by the OGRTF comments.
|
Passed
|
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
04/15/2008
|
| Sponsor: |
Walter Reid on behalf of Wind Coalition
|
| Urgent: |
No
|
| Sections: |
3.1.4.1, 3.1.4.6
|
| Description: |
This Operating Guide Revision Request (OGRR) proposes a requirement for VRT capability for all new generating units.
|
| Reason: |
This OGRR is being proposed for the following reasons: (1) Passing of FERC 661A, Eminent NERC Standard drafting process takes time; (2) Although wind manufacturers are adding VRT capability to new designs, we must proceed before NERC due to large amounts of proposed wind generation next year and next few years in ERCOT that could pose a reliability threat in the event of voltage excursions; and (3) Concern of sudden voltage changes causing tripping of units without VRT capability.
|
-
(04/15/08, .doc, 273 KB)
-
(04/21/08, .doc, 37 KB)
-
(05/02/08, .doc, 241 KB)
-
(05/12/08, .doc, 224 KB)
-
(05/15/08, .doc, 404 KB)
-
(05/16/08, .doc, 218.5 KB)
-
(05/20/08, .doc, 40 KB)
-
(05/21/08, .doc, 285 KB)
-
(06/17/08, .doc, 399.5 KB)
-
(06/19/08, .doc, 463.5 KB)
-
(07/09/08, .doc, 44.5 KB)
-
(07/16/08, .doc, 464.5 KB)
-
(08/15/08, .doc, 465 KB)
-
(08/19/08, .doc, 417 KB)
-
(08/21/08, .doc, 467 KB)
-
(09/15/08, .doc, 470 KB)
-
(09/19/08, .doc, 414 KB)
-
(09/23/08, .doc, 50 KB)
-
(09/25/08, .doc, 50 KB)
-
(09/25/08, .doc, 403.5 KB)
-
(09/30/08, .doc, 1.9 MB)
-
(09/30/08, .doc, 41 KB)
-
(09/30/08, .doc, 48 KB)
-
(10/01/08, .doc, 46.5 KB)
-
(10/03/08, .doc, 483 KB)