Nodal Protocol Revision Requests 401-425
This section contains completed NPRRs (approved, rejected or withdrawn).
Approved
| NPRR401 | Clarification of Timing for a Generation Resource to be Considered Self-Committed |
| NPRR402 | Clarification of Pre-DAM RUC Instruction Sequence |
| NPRR403 | Revised FASD Calculation for TX SET Version 4.0 Release |
| NPRR404 | Clarification of Form of Notice of Suspension of Operations |
| NPRR405 | Clarification of DC Tie Load into Operational Systems and Processes |
| NPRR406 | Clarification of the Timeline for Calculating the Value of X at Minimum Energy Level |
| NPRR407 | Credit Monitoring Posting Requirements (formerly “Credit Monitoring Credit Parameters Posting Requirements”) |
| NPRR408 | Clarification of ERCOT Authority to Deny Energization of Non-Compliant Generators |
| NPRR411 | Administrative Changes for the October 1, 2011 Protocols |
| NPRR412 | Quick Start Generation Resource Compliance Metric Adjustments |
| NPRR413 | Oklaunion Exemption Calculation Verification |
| NPRR414 | UFE Calculation Clarifications |
| NPRR415 | Inadvertent Interchange and Inadvertent Energy Clarification |
| NPRR417 | TDSP Submittal of Consumption and Demand Values for AMS ESI IDs |
| NPRR419 | Revise Real-Time Energy Imbalance and RMR Adjustment Charge |
| NPRR421 | Clarification of RMR Notifications |
| NPRR422 | Public DAM Shift Factors |
| NPRR423 | Add Voltage Support Requirement for IRRs and Allow SCADA Control of Static VAr Devices if Approved by ERCOT (formerly “Add Voltage Support Requirement for IRRs and Allow Manual Control of Static VAr Devices if Approved by ERCOT”) |
| NPRR424 | Reactive Capability Testing Requirements for IRRs |
Rejected
| NPRR418 | Reporting of Resource Forced Outages |
Withdrawn
| NPRR409 | Outage Planning Criteria Clarifications and Enhancements to Narrow Gap Between Real-Time Operations and Outage Planning |
| NPRR410 | Definition of an Energy Storage Resource |
| NPRR420 | Correct South Hub Back to Original Definition |