Nodal Protocol Revision Requests 401-425

This section contains completed NPRRs (approved, rejected or withdrawn).

Approved

NPRR401 Clarification of Timing for a Generation Resource to be Considered Self-Committed
NPRR402 Clarification of Pre-DAM RUC Instruction Sequence
NPRR403 Revised FASD Calculation for TX SET Version 4.0 Release
NPRR404 Clarification of Form of Notice of Suspension of Operations
NPRR405 Clarification of DC Tie Load into Operational Systems and Processes
NPRR406 Clarification of the Timeline for Calculating the Value of X at Minimum Energy Level
NPRR407 Credit Monitoring Posting Requirements (formerly “Credit Monitoring Credit Parameters Posting Requirements”)
NPRR408 Clarification of ERCOT Authority to Deny Energization of Non-Compliant Generators
NPRR411 Administrative Changes for the October 1, 2011 Protocols
NPRR412 Quick Start Generation Resource Compliance Metric Adjustments
NPRR413 Oklaunion Exemption Calculation Verification
NPRR414 UFE Calculation Clarifications
NPRR415 Inadvertent Interchange and Inadvertent Energy Clarification
NPRR417 TDSP Submittal of Consumption and Demand Values for AMS ESI IDs
NPRR419 Revise Real-Time Energy Imbalance and RMR Adjustment Charge
NPRR421 Clarification of RMR Notifications
NPRR422 Public DAM Shift Factors
NPRR423 Add Voltage Support Requirement for IRRs and Allow SCADA Control of Static VAr Devices if Approved by ERCOT (formerly “Add Voltage Support Requirement for IRRs and Allow Manual Control of Static VAr Devices if Approved by ERCOT”)
NPRR424 Reactive Capability Testing Requirements for IRRs

Rejected

NPRR418 Reporting of Resource Forced Outages

Withdrawn

NPRR409 Outage Planning Criteria Clarifications and Enhancements to Narrow Gap Between Real-Time Operations and Outage Planning
NPRR410 Definition of an Energy Storage Resource
NPRR420 Correct South Hub Back to Original Definition