Nodal Protocol Revision Requests 376-400

This section contains completed NPRRs (approved, rejected or withdrawn).

Approved

NPRR376 CRR Volume Limitation Enhancements
NPRR377 Alternate Inputs to Base Point Deviation Charge
NPRR379 EILS Dispatch Sequence and Performance Criteria Upgrades
NPRR380 Minor Changes to Default Uplift Invoice
NPRR382 Verbal RUC Committed or Decommitted Resources Report
NPRR383 Unconfirmed Trades Reports
NPRR384 Revisions to Support SCR766 , Load Zone and Hub LMPs Distributed by ICCP (formerly “Load Zone Price Distributed by ICCP”)
NPRR387 Hydro RRS Deployment Under Frequency Relay Set Point
NPRR388 Clarification of Quick Start Generation Resource Performance Criteria
NPRR389 Modification of Voltage Support Requirements to Address Existing Non-Exempt WGRs
NPRR390 Clarification of the Applicability of the Use of the Refund Option
NPRR391 Shortening RTM Settlement and Payment Timeline and Eliminate ACH as a Mode of Payment
NPRR392 Credit Review During CRR Auction
NPRR393 SCED Constraint Management Transparency
NPRR394 Outage Reporting
NPRR395 CRR Auction Offer Award Disclosure
NPRR396 Reduce Standard O&M Costs
NPRR397 Balance of the Day Ancillary Service Market
NPRR398 Changes to Resource Category Minimum-Energy Generic Heat Rates
NPRR399 Updates to Protocol Sections Related to Settlements and Billing
NPRR400 Eliminate Unsecured Credit for CRR Auctions and for Future Credit Exposure and Eliminate Netting of FCE with CCE

Rejected

NPRR386 Reduce the Frequency of Unregistered Distributed Generation Reports 

Withdrawn

NPRR378 Posting of the ERCOT Short-Term Load Forecast and the Aggregated HDL and LDL Used in SCED
NPRR381 Registration Requirements for Interconnecting Entities