Nodal Protocol Revision Requests 351-375

This section contains completed NPRRs (approved, rejected or withdrawn).

Approved

NPRR351 SCED Look-Ahead Step 1: Pricing: Calculate Non-Binding Prices and Basepoints for Initial Research into SCED Look-Ahead and allow Consumers to have a Forward Price Projection (formerly “Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes”)
NPRR352 Real-Time HSL Telemetry for WGRs
NPRR353 Administrative Changes for the May 1, 2011 Protocols
NPRR354 Revisions to Non-Spin Performance Criteria Language and Provision for ICCP Telemetry of Non-Spin Deployment
NPRR355 Adjust the Calculation of the Real-Time Settlement Point Price for a Load Zone
NPRR356 EEA Changes Related to Dispatch Instructions and BLTs
NPRR357 Revisions to Collateral Requirements Concerning CRR Auctions (formerly “Multi-Month CRR Auction and Revisions to Collateral Requirements”)
NPRR358 Clarification of Responsible Entity for Binding Obligations
NPRR359 Monthly TDSP Load Report
NPRR360 Summary Report of HDL and LDL
NPRR361 Real-Time Wind Power Production Data Transparency
NPRR362 Changes to PRC Calculation
NPRR364 Clarify Active and Inactive SCED Constraint Reporting
NPRR365 Change in Resource Outage Approvals from Eight to 45 Days (formerly “Change in Resource Outage Approvals from Eight to 90 Days”)
NPRR369 Black Start Service Requirement Revisions
NPRR370 Supplementary Ancillary Services Market Modifications
NPRR372 Administrative Changes for the July 1, 2011 Protocols to Update Audit References
NPRR374 Modification of SCR Process and Urgency Requirements
NPRR375 Extend the Reporting Horizon for CDR Inputs

Rejected

NPRR363 Revision to EEA Level 2B ERCOT Requirements During the EILS VDI
NPRR367 Shaping of PTP Options Taken to Real-Time to Match Forecasted Load
NPRR368 Clarification of the Purpose of Point-to-Point Options

Withdrawn

NPRR366 Generation Resource Power Factor Criteria Clarification
NPRR371 Telemetered LSL for QSGR
NPRR373 Revised State Estimator Reports on Individual Transmission Load on Electrical Buses