Nodal Protocol Revision Requests 301-325
This section contains completed NPRRs (approved, rejected or withdrawn).
Approved
| NPRR301 | Correct Energy Trade Language for Adjustment Period |
| NPRR302 | Correct Fuel Type Language for Mitigated Offer Cap |
| NPRR303 | Requirement to Post PTP Options Cleared in DAM or Taken to Real-Time |
| NPRR304 | Removal of Frequency Bias Methodology Approval Requirement |
| NPRR305 | Timeline for Calculating the Value of X |
| NPRR306 | Revisions to Protected Information to Include Black Start Documents Considered CEII |
| NPRR307 | Change SASM Offer Procedures |
| NPRR310 | Expand Output Schedule Acceptable Range to Include HSL and LSL |
| NPRR311 | Correction of Wind Adjust Formula to Account for Daylight Savings Time |
| NPRR312 | Clarification of QSE Requirements for Split Generation Resources |
| NPRR313 | Revisions to the Resource Plan Reference to Current Operating Plan for EILS and Synchronous Condensers and Black Start Notification Requirements (formerly “Updating the Term Resource Plan to Current Operating Plan”) |
| NPRR314 | Requirement to Post Generation Resources Temporal Constraints |
| NPRR316 | Negative Self-Arranged Ancillary Services Quantity (formerly “Negative Self-Arranged Ancillary Services”) |
| NPRR317 | Clarification of Entity Responsible for Hydro Responsive Testing |
| NPRR318 | Alignment of Nodal Registration Requirements with Current Registration Process |
| NPRR319 | Required Documentation to Recover Fuel Costs for RUC Deployments |
| NPRR320 | Minimum PTP Option Bid and Settlement (formerly "Minimum PTP Option Bids and CRR Auction Fees") |
| NPRR321 | Allow Change to Energy Offer Curve MW Amounts in the Adjustment Period (formerly "Allow Change to Energy Offer Curve MW Amounts in the Adjustment Period for Qualifying Facilities") |
| NPRR322 | Real-Time PTP Option Modeling |
| NPRR323 | Correct DAM Credit Exposure Language and Enable Qualified Expiring CRRs to Offset PTP Bid Exposure |
| NPRR324 | Conductor/Transformer Transmission Facility Rating |
| NPRR325 | Price Correction During SCED Process Failure |
Rejected
| NPRR308 | Deployment Procedures for Non-Spin Resources |
| NPRR309 | Providing STWPF to QSEs Contractually Affiliated with WGR |
| NPRR315 | Revision of Responsive Reserve Measure to High Emergency Limit (formerly “Revision of Responsive Reserve Measure to Net Dependable Capability) |