Nodal Protocol Revision Requests 276-300
This section contains completed NPRRs (approved, rejected or withdrawn).
Approved
| NPRR276 | MIS Posting Requirement for the Network Operations Model Load Schedule |
| NPRR277 | Removal of NPRR119 Language for LDL Calculation and Modification to the SCED Ramp Rate Calculation (formerly “Removal of NPRR119 Language for LDL Calculation”) |
| NPRR278 | Emergency Interruptible Load Service (EILS) Modifications to Correct Self-Provision Settlement Equations, to Accommodate Advanced Metering Infrastructure, and other Clarifications |
| NPRR279 | Resolution of Alignment Item A144 - Clarify Posting of MCPC for DAM and SASM |
| NPRR280 | Move Shift Factor Posting Requirement to Real-Time |
| NPRR281 | Replace 7-Day Forecast Requirement for QSEs Representing WGRs |
| NPRR282 | Dynamic Ramp Rates Use in SCED |
| NPRR283 | Clarification of PCRR Allocation Eligibility |
| NPRR284 | Cost Allocation Zones as They Relate to NOIE Load Zones – As Built Systems |
| NPRR285 | Generation Resource Base Point Deviation Charge Corrections |
| NPRR286 | DAM Credit – Non-Business Day Processing |
| NPRR288 | Selection of CRR Load Distribution Factors for Use in CRR Monthly and Annual Auctions |
| NPRR289 | Clarify Use of Raise/Lower Block Status Telemetry |
| NPRR290 | ERCOT Publication of DAM PSS/E Files |
| NPRR291 | Reduce the Comment Period for NPRRs and SCRs |
| NPRR292 | Add Key Provisions of RPG Charter to Protocols |
| NPRR293 | Requirement to Post PTP Obligation Quantities Awarded in DAM (formerly “Requirement to Post CRR Option and Obligation Quantities Cleared in DAM or Taken to Real Time”) |
| NPRR294 | Texas SET 4.0 Including: Acquisition and Transfer of Customers From One REP to Another; Meter Tampering Transactional Solution |
| NPRR295 | Synchronization of Protocol for Generation Resource Designation as Mothballed or Decommissioned |
| NPRR296 | Remove Posting Requirement for the Annual Planning Model for the CRR Auction |
| NPRR297 | Add Administrative NPRR Process to Nodal Protocols |
| NPRR298 | New Definitions Related to Black Start and Clarification to the Hourly Standby Fee Payments for Black Start Resources (formerly “New Definitions Related to Black Start”) |
| NPRR299 | Remove Requirement for ERCOT Board Approval of PUCT, IMM, and FERC Required Reports |
Rejected
| NPRR287 | Real-Time Market Price Delivery Consistency |
| NPRR300 | Municipal Owned Utility Addition to Determination of Total Potential Exposure for a Counter-Party |