| Date | Gov Body | Action Taken | Next Steps | |
|---|---|---|---|---|
| 11/16/2010 | Board of Directors |
|
Approved | |
| 11/04/2010 | TAC |
|
Recommended for Approval | ERCOT Board consideration of NPRR278 |
| 10/21/2010 | PRS |
|
Recommended for Approval | TAC consideration of NPRR278 |
| 09/23/2010 | PRS | Deferred/Tabled | PRS language consideration | |
| Date | Gov Body | Motion | Result | Against | Abstentions |
|---|---|---|---|---|---|
| 11/16/2010 | Board of Directors | To approve NPRR278 as recommended by TAC in the 11/4/10 TAC Report. | Passed | ||
| 11/04/2010 | TAC | to recommend approval of NPRR278 as recommended by PRS in the 10/21/10 PRS Report. | Passed | 1 Consumer | 0 |
| 10/21/2010 | PRS | To recommend approval of NPRR278 as amended by the 10/20/10 WMS comments and as revised by PRS and to forward NPRR278 and the Impact Analysis to TAC. | Passed | 0 | 0 |
| 09/23/2010 | PRS | To table NPRR278. | Passed | 0 | 1 Ind Gen |
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: | Approved |
| Date Posted: | 09/16/2010 |
| Sponsor: | ERCOT |
| Urgent: | No |
| Sections: | 2.1, 3.14.3, 6.6.11.1, 6.6.11.2, 8.1.3.1, 8.1.3.2, 8.1.3.3, 8.1.3.3.1 |
| Description: |
This Nodal Protocol Revision Request (NPRR) proposes several modifications to the Nodal Protocols relating to EILS. The four changes proposed in this NPRR that ERCOT considers to be most important are as follows: · Amends Section 3.14.3, specifically paragraphs (8)(b), (c) and (d), and Sections 6.6.11.1 and 6.6.11.2 to correct a Settlement inequity for Qualified Scheduling Entities (QSEs) providing EILS through Self-Provision. · Amends Section 8.1.3.1, specifically paragraph (2)(b), to provide ERCOT with an important option for accommodating EILS Loads potentially consisting of large aggregations of Customers with Advanced Meters. · Amends paragraph (7)(f) of Section 3.14.3 to remove the requirement that EILS capacity offers must be submitted in whole MW amounts. · Adds a new paragraph (5)(e) to Section 8.1.3.1 to define a mechanism for ERCOT to reduce the payment for an EILS Load that fails two consecutive Load-shed tests in an EILS Contract Period. In addition, this NPRR proposes additional modifications related to EILS that ERCOT considers to be clarifying in nature. For additional detail regarding the revisions proposed in this NPRR, please see “Comments” section of NPRR submission form (Key Documents tab). |
| Reason: | Equity in EILS Settlement, avoidance of a potentially burdensome requirement on ERCOT, and additional clarity on several other minor issues. |
-
(09/16/10, .doc, 384 KB)
-
(09/16/10, .doc, 70 KB)
-
(09/16/10, .doc, 46.5 KB)
-
(09/27/10, .doc, 357 KB)
-
(10/20/10, .doc, 259.5 KB)
-
(10/25/10, .DOC, 348 KB)
-
(11/04/10, .doc, 348.5 KB)
-
(11/16/10, .doc, 349.5 KB)