Nodal Protocol Revision Requests 251-275

This section contains completed NPRRs (approved, rejected or withdrawn).

Approved

NPRR251 Synchronization of PRR845, Definition for IDR Meters and Optional Removal of IDR Meters at a Premise Where an Advanced Meter Can be Provisioned
NPRR252 Synchronization of PRR758, Clarification of Language Related to Generation Netting for ERCOT Polled Settlement Meters
NPRR253 CRR Balancing Account Invoice and Settlement and Billing Dispute Process
NPRR254 Updates to Protocol Sections 14 and 18
NPRR255 Resolution of Alignment Item A81 - DRUC Timing and Execution when DAM is Delayed or Aborted
NPRR256 Synchronize Nodal Protocols with PRR787, Add Non-Compliance Language to QSE Performance Standards (formerly “Add Violation Language to QSE Performance Standards”)
NPRR257 Synchronization with Nodal Operating Guide Section 9, Monitoring Programs and Changes to Posting Requirements of Documents Considered CEII (formerly “Synchronization with Nodal Operating Guide Section 9, Monitoring Programs”)
NPRR258 Synchronization with PRR824 and PRR833 and Additional Clarifications
NPRR259 Resolution of Alignment Items A175 and A176 - Settlement of Generation Resources Dispatched to Meet System Reliability Requirements
NPRR260 Providing Access to MIS Secure Area to MIS Registered Users
NPRR261 Revision of Data Submission Timeline for Network Model
NPRR262 Protocol Synchronization for Nodal Implementation Surcharge
NPRR263 Resolution of Alignment Item A99 - Settlement Point Price Calculation When Busses are De-energized
NPRR264 Clarification of Nodal Protocol Requirements for Generators With Multiple Points of Interconnection
NPRR265 MIS Secure Area Posting of Resource Category – As-Built Clarification
NPRR266 Installed Capacity of Unregistered Distributed Generation (DG)
NPRR267 Remove All References to Pseudo Devices (formerly “Allow ERCOT to Manage Operations Model Pseudo Devices”)
NPRR268 Posting Requirements of Verifiable Costs Documents
NPRR269 Synchronization of PRR830, Reactive Power Capability Requirement
NPRR270 Defining the Variable Used in the Wind Generation Formula
NPRR271 Synchronization to PRR850, Weather Responsiveness Determination for Interval Data Recorders
NPRR272 Definition and Participation of Quick Start Generation Resources
NPRR273 Allow Use of the ONTEST Resource Status to Indicate Resource Startup, Shutdown and Test Operations
NPRR274 Generic Startup Costs for Combined Cycle Generation Resources – Removal of Temporal Constraint
NPRR275 Clarify QSE’s Ability to Make Changes to Ancillary Service Resource Responsibility In Real Time