This section contains completed NPRRs (approved, rejected or withdrawn).
Approved
| NPRR251 | Synchronization of PRR845, Definition for IDR Meters and Optional Removal of IDR Meters at a Premise Where an Advanced Meter Can be Provisioned |
| NPRR252 | Synchronization of PRR758, Clarification of Language Related to Generation Netting for ERCOT Polled Settlement Meters |
| NPRR253 | CRR Balancing Account Invoice and Settlement and Billing Dispute Process |
| NPRR254 | Updates to Protocol Sections 14 and 18 |
| NPRR255 | Resolution of Alignment Item A81 - DRUC Timing and Execution when DAM is Delayed or Aborted |
| NPRR256 | Synchronize Nodal Protocols with PRR787, Add Non-Compliance Language to QSE Performance Standards (formerly “Add Violation Language to QSE Performance Standards”) |
| NPRR257 | Synchronization with Nodal Operating Guide Section 9, Monitoring Programs and Changes to Posting Requirements of Documents Considered CEII (formerly “Synchronization with Nodal Operating Guide Section 9, Monitoring Programs”) |
| NPRR258 | Synchronization with PRR824 and PRR833 and Additional Clarifications |
| NPRR259 | Resolution of Alignment Items A175 and A176 - Settlement of Generation Resources Dispatched to Meet System Reliability Requirements |
| NPRR260 | Providing Access to MIS Secure Area to MIS Registered Users |
| NPRR261 | Revision of Data Submission Timeline for Network Model |
| NPRR262 | Protocol Synchronization for Nodal Implementation Surcharge |
| NPRR263 | Resolution of Alignment Item A99 - Settlement Point Price Calculation When Busses are De-energized |
| NPRR264 | Clarification of Nodal Protocol Requirements for Generators With Multiple Points of Interconnection |
| NPRR265 | MIS Secure Area Posting of Resource Category – As-Built Clarification |
| NPRR266 | Installed Capacity of Unregistered Distributed Generation (DG) |
| NPRR267 | Remove All References to Pseudo Devices (formerly “Allow ERCOT to Manage Operations Model Pseudo Devices”) |
| NPRR268 | Posting Requirements of Verifiable Costs Documents |
| NPRR269 | Synchronization of PRR830, Reactive Power Capability Requirement |
| NPRR270 | Defining the Variable Used in the Wind Generation Formula |
| NPRR271 | Synchronization to PRR850, Weather Responsiveness Determination for Interval Data Recorders |
| NPRR272 | Definition and Participation of Quick Start Generation Resources |
| NPRR273 | Allow Use of the ONTEST Resource Status to Indicate Resource Startup, Shutdown and Test Operations |
| NPRR274 | Generic Startup Costs for Combined Cycle Generation Resources – Removal of Temporal Constraint |
| NPRR275 | Clarify QSE’s Ability to Make Changes to Ancillary Service Resource Responsibility In Real Time |