NPRR204
| Title: |
Update Generic Startup Cost for Reciprocating Engines
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 03/23/2010
|
| Related Issue: |
PRR842 |
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
03/23/2010
|
Board of Directors
|
To approve NPRR204 as recommended by TAC in the 3/4/10 TAC Report.
|
Passed
|
|
|
|
03/04/2010
|
TAC
|
To recommend approval of NPRR204 as recommended by PRS in the 2/18/10 PRS Report.
|
Passed
|
0
|
0
|
|
02/18/2010
|
PRS
|
To endorse and forward the 1/21/10 PRS Report and Impact Analysis for NPRR204 to TAC.
|
Passed
|
1 Consumer
|
0
|
|
01/21/2010
|
PRS
|
To recommend approval of NPRR204 as submitted.
|
Passed
|
2 Ind Gen, Consumer
|
1 IPM
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
12/22/2009
|
| Sponsor: |
South Texas Electric Cooperative, Inc.
|
| Urgent: |
No
|
| Sections: |
4.4.9.2.3
|
| Description: |
This Nodal Protocol Revision Request (NPRR) adds an Operations and Maintenance (O&M) cost for the “Reciprocating Engines” Resource category to the Resource Category Startup Offer Generic Cap determination.
|
| Reason: |
The current Nodal Protocols utilize a $1 O&M cost for Reciprocating Engines. This is not representative of the O&M for this technology type.
|
-
(12/22/09, .doc, 101 KB)
-
(12/22/09, .doc, 68.5 KB)
-
(01/25/10, .doc, 112 KB)
-
(01/26/10, .doc, 46.5 KB)
-
(02/19/10, .doc, 113.5 KB)
-
(03/05/10, .doc, 115.5 KB)
-
(03/23/10, .doc, 118 KB)