Nodal Protocol Revision Requests 151-175

This section contains completed NPRRs (approved, rejected or withdrawn).

Approved

NPRR152 References to Section 22 Attachments
NPRR153 Generation Resource Fixed Quantity Block
NPRR154 Corrections of Entities Able to Bid for Point-To-Point Obligations in the Day-Ahead Market
NPRR155 Clarification of Authorized Representative
NPRR156 Transparency for PSS and Full Interconnection Studies
NPRR157 Extending Black Start Service Bid Timeline
NPRR158 EILS Self-Provision Formula Correction and Clarifications
NPRR159 Resource Category Startup Offer Generic Cap for Wind Resources
NPRR160 Elimination of the Non-ERCOT LSE Fee
NPRR161 Clarification of Establishing Decision-Making Authority of Managed Capacity
NPRR162 Change the Sign Convention of Net Real Power Consumption, LPC and MPC of Load Resources (formerly titled “Change the Sign Convention for Load Resources”)
NPRR163 Removal of Late Fee Language
NPRR164 Resubmitting Ancillary Service Offers in SASM
NPRR165 Synchronizing Section 1 with PRR697
NPRR166 Timing for Required Black Start Unit Load Carrying Test
NPRR167 Options for Filing Verifiable Costs – QSEs or Resources
NPRR168 Change the Definition of "Start-up" and Include the Fuel from Breaker Close to LSL in Startup Costs (formerly titled "Verifiable Costs General Corrections")
NPRR169 Clarify the Calculation and Posting of LMPs for the Load Zone and LMPs for each Hub
NPRR170 Synchronization of PRR806, Re-Registration of Market Participant due to Mass Transition of ESI IDs
NPRR171 Synchronization of PRR805, Adding POLR Customer Class and AMS Meter Flag to the Database Query Function on the MIS
NPRR172 Synchronization of Section 15 with PRR782, Clean-up and Corrections to Terminology and Transaction Timings in Protocol Section 15, Customer Registration
NPRR173 Reduce the Minimum Quantity for Ancillary Service Offers
NPRR174 FIP Modifications in Verifiable Startup and Minimum Energy Cost and Recovery of Exceptional Fuel Costs During RUC Intervals
NPRR175 Hub Bus List Clarification

Withdrawn

NPRR151 Clarify Definition of a Generator Output Breaker in the Outage Scheduler