Nodal Protocol Revision Requests 151-175
This section contains completed NPRRs (approved, rejected or withdrawn).
Approved
| NPRR152 | References to Section 22 Attachments |
| NPRR153 | Generation Resource Fixed Quantity Block |
| NPRR154 | Corrections of Entities Able to Bid for Point-To-Point Obligations in the Day-Ahead Market |
| NPRR155 | Clarification of Authorized Representative |
| NPRR156 | Transparency for PSS and Full Interconnection Studies |
| NPRR157 | Extending Black Start Service Bid Timeline |
| NPRR158 | EILS Self-Provision Formula Correction and Clarifications |
| NPRR159 | Resource Category Startup Offer Generic Cap for Wind Resources |
| NPRR160 | Elimination of the Non-ERCOT LSE Fee |
| NPRR161 | Clarification of Establishing Decision-Making Authority of Managed Capacity |
| NPRR162 | Change the Sign Convention of Net Real Power Consumption, LPC and MPC of Load Resources (formerly titled “Change the Sign Convention for Load Resources”) |
| NPRR163 | Removal of Late Fee Language |
| NPRR164 | Resubmitting Ancillary Service Offers in SASM |
| NPRR165 | Synchronizing Section 1 with PRR697 |
| NPRR166 | Timing for Required Black Start Unit Load Carrying Test |
| NPRR167 | Options for Filing Verifiable Costs – QSEs or Resources |
| NPRR168 | Change the Definition of "Start-up" and Include the Fuel from Breaker Close to LSL in Startup Costs (formerly titled "Verifiable Costs General Corrections") |
| NPRR169 | Clarify the Calculation and Posting of LMPs for the Load Zone and LMPs for each Hub |
| NPRR170 | Synchronization of PRR806, Re-Registration of Market Participant due to Mass Transition of ESI IDs |
| NPRR171 | Synchronization of PRR805, Adding POLR Customer Class and AMS Meter Flag to the Database Query Function on the MIS |
| NPRR172 | Synchronization of Section 15 with PRR782, Clean-up and Corrections to Terminology and Transaction Timings in Protocol Section 15, Customer Registration |
| NPRR173 | Reduce the Minimum Quantity for Ancillary Service Offers |
| NPRR174 | FIP Modifications in Verifiable Startup and Minimum Energy Cost and Recovery of Exceptional Fuel Costs During RUC Intervals |
| NPRR175 | Hub Bus List Clarification |
Withdrawn
| NPRR151 | Clarify Definition of a Generator Output Breaker in the Outage Scheduler |