NPRR166
| Title: |
Timing for Required Black Start Unit Load Carrying Test
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 05/20/2009
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
05/20/2009
|
Board of Directors
|
To approve NPRR166 as recommended by TAC.
|
Passed
|
0
|
0
|
|
05/07/2009
|
TAC
|
to recommend approval of NPRR166 as recommended by PRS
|
Passed
|
0
|
0
|
|
04/23/2009
|
PRS
|
To endorse and forward the PRS Recommendation Report and Impact Analysis for NPRR166 to TAC
|
Passed
|
0
|
0
|
|
03/19/2009
|
PRS
|
To recommend approval of NPRR166 as submitted
|
Passed
|
0
|
0
|
|
12/18/2008
|
PRS
|
To refer NPRR166 to TPTF for review.
|
Passed
|
0
|
0
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
11/20/2008
|
| Sponsor: |
ERCOT
|
| Urgent: |
No
|
| Sections: |
8.1.1.2.1.5
|
| Description: |
This Nodal Protocol Revision Request (NPRR) synchronizes the Nodal Protocols with changes being proposed to the zonal Protocols through Protocol Revision Request (PRR) 785. This NPRR changes the required Black Start Unit Load Carrying Test from once every six years to once every five years.
|
| Reason: |
North American Electric Reliability Corporation (NERC) requires Black Start Unit Testing at a minimum of every five years. This change reduces ambiguity and risk of a NERC compliance violation.
|
-
(11/20/08, .doc, 93.5 KB)
-
(11/20/08, .doc, 48 KB)
-
(12/03/08, .doc, 39.5 KB)
-
(12/19/08, .doc, 92.5 KB)
-
(02/24/09, .doc, 67 KB)
-
(03/20/09, .doc, 86.5 KB)
-
(04/17/09, .doc, 139.5 KB)
-
(04/21/09, .doc, 45.5 KB)
-
(04/27/09, .doc, 88 KB)
-
(05/08/09, .doc, 89 KB)
-
(05/22/09, .doc, 91 KB)