NPRR151
| Title: |
Clarify Definition of a Generator Output Breaker in the Outage Scheduler
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Withdrawn
on 03/26/2009
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
03/19/2009
|
PRS
|
To table NPRR151
|
Passed
|
|
|
|
09/24/2008
|
PRS
|
To refer NPRR151 to TPTF for review of CPS Energy’s and Luminant’s comments.
|
Passed
|
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Withdrawn
|
| Date Posted: |
09/08/2008
|
| Sponsor: |
Anthony Alford w/ CenterPoint Energy
|
| Urgent: |
No
|
| Sections: |
3.10.7.5.1, Continuous Telemetry of the Status of Breakers and Switches
|
| Description: |
This Nodal Protocol Revision Request (NPRR) clarifies the definition of which “generator output breakers” are exempt in the Outage Scheduler.
|
| Reason: |
Depending upon the configuration of the substation could result in reliability issues when the breakers that control generating unit output are left open indefinitely, and not reported in Outage Scheduler.
|
-
(09/08/08, .doc, 89 KB)
-
(09/10/08, .doc, 52 KB)
-
(02/06/09, .xls, 86.5 KB)
-
(09/23/08, .doc, 56 KB)
-
(09/23/08, .doc, 52 KB)
-
(09/29/08, .doc, 93.5 KB)
-
(02/24/09, .doc, 67 KB)
-
(03/20/09, .doc, 97 KB)
-
(03/26/09, .doc, 38 KB)