NPRR107
| Title: |
Nodal Emergency Interruptible Load Service (EILS)
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 07/15/2008
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
07/15/2008
|
Board of Directors
|
Approve NPRR107 as recommended by TAC.
|
Passed
|
|
|
|
06/26/2008
|
TAC
|
To recommend approval of NPRR107 as recommended by PRS.
|
Passed
|
0
|
2 IPM
|
|
06/19/2008
|
PRS
|
To recommend approval of NPRR107 as revised by ERCOT Staff 061808 comments, endorse the Impact Analysis and Recommendation Report, and forward the documents to TAC.
|
Passed
|
0
|
0
|
|
05/22/2008
|
PRS
|
To recommend approval of NPRR107 as revised by TPTF comments. The motion passed with one opposing vote from the Independent Power Marketer (IPM) Market Segment and four abstentions from the Municipally Owned Utility (MOU), Investor Owned Utility (IOU), Independent Generator (IG), IPM, and Independent Retail Electric Provider (IREP) Market Segments. All Market Segments were present for the vote.
|
Passed
|
1 IPM
|
4 MOU, IOU, IG, IPM, and IREP
|
|
03/20/2008
|
PRS
|
To refer NPRR107 to TPTF for review.
|
Passed
|
0
|
0
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
02/29/2008
|
| Sponsor: |
ERCOT Staff
|
| Urgent: |
No
|
| Sections: |
Section 2, Definitions and Acronyms; Section 3.14, Contracts for Reliability Resources; Section 3.14.3, Emergency Interruptible Load Service (EILS) (New); Section 6.5.8.1, Deployment of Emergency Interruptible Load Service (EILS) (New); Section 6.5.9, Emergency Operations; Section 6.5.9.4, Emergency Electric Curtailment Plan Section; 6.5.9.7, Emergency Interruptible Load Service (EILS) (New); Section 6.6.11, Emergency Interruptible Load Service (EILS) Settlement (New); Section 8.1.3, Emergency Interruptible Load Service (EILS) Performance Criteria and Testing Requirements (New); Section 9.14.5, Resettlement of Emergency Interruptible Load Service (New); (subsequent subsections in Section 9.14 renumbered); Section 16.13, Registration of Emergency Interruptible Load Service (EILS) Resources (New); Section 22 -- Attachment 22K, Standard Form Emergency Interruptible Load Service Agreement (Reformatted)
|
| Description: |
This NPRR modifies the ERCOT Nodal Protocols to transition the EILS to the Nodal market. EILS is deployed during an Emergency Electric Curtailment Plan (EECP), after all available Generation and Loads acting as Resources (LaaRs) have been deployed. This NPRR makes no material changes to EILS as it currently is defined in the Zonal Protocols. In various cases, certain language has been modified slightly to enhance clarity.
|
| Reason: |
EILS is required by PUC Subst. R. 25.507, Electric Reliability Council of Texas (ERCOT) Emergency Interruptible Load Service (EILS).
|
-
(02/29/08, .doc, 635 KB)
-
(03/25/08, .doc, 636 KB)
-
(04/16/08, .doc, 624.5 KB)
-
(05/08/08, .xls, 91.5 KB)
-
(05/09/08, .doc, 589 KB)
-
(05/28/08, .doc, 667.5 KB)
-
(06/13/08, .doc, 49 KB)
-
(06/18/08, .doc, 654.5 KB)
-
(06/18/08, .doc, 49.5 KB)
-
(06/19/08, .doc, 694.5 KB)
-
(06/27/08, .doc, 700 KB)
-
(07/17/08, .doc, 701 KB)