Nodal Operating Guide Revision Requests 051-075

This section contains completed NOGRRs (approved, rejected or withdrawn).

Approved

NOGRR051 Synchronization with OGRR192 and OGRR238
NOGRR052 Conductor/Transformer Transmission Facility Rating
NOGRR053 Synchronization with OGRR226, Generation Resource Response Time Requirement
NOGRR054 Change in Facilitator for the Annual Operations Training Seminar
NOGRR055 Deletion of an Invalid Reference to a Non-Existent NERC Term
NOGRR056 Synchronization with NPRR291, Reduce the Comment Period for NPRRs and SCRs
NOGRR057 Daily Report Containing Loss of Generation Greater than 450 MW
NOGRR058 Deletion of Section 5, Planning
NOGRR059 Administrative Changes for March 1, 2011 Nodal Operating Guides
NOGRR060 Updating the Term Resource Plan to Current Operating Plan
NOGRR061 Posting Requirement for Hydro-Responsive Testing
NOGRR062 Require Voltage Ride-Through Capability for IRRs
NOGRR063 Additional Method for Submitting Back-up Control Plans
NOGRR064 QSE Acknowledgement of VSS Dispatch Instructions
NOGRR066 ERCOT WAN Connection Termination Requirement
NOGRR067 Review and Analysis of Turbine Speed Governor Performance
NOGRR068 Hydro-Responsive Reserve
NOGRR069 Relay Misoperation Reporting Changes for Consistency with ERO-RAPA Proposal
NOGRR070 Synchronization with NPRR356, EEA Changes Related to Dispatch Instructions and BLTs
NOGRR071 Synchronization with NPRR362, Changes to PRC Calculation
NOGRR072 Administrative Changes for June 1, 2011 Nodal Operating Guides
NOGRR074 Clarified Responsible Entities for Reporting Sabotage Information to NERC

Rejected

NOGRR075 Synchronization with NPRR363, Revision to EEA Level 2B ERCOT Requirements During the EILS VDI

Withdrawn

NOGRR065 Authorize ERCOT to Procure Additional RRS During Severe Cold Weather
NOGRR073 Entity Responsible for Load Shed During EEA Level 3