Nodal Operating Guide Revision Requests 051-075
This section contains completed NOGRRs (approved, rejected or withdrawn).
Approved
| NOGRR051 | Synchronization with OGRR192 and OGRR238 |
| NOGRR052 | Conductor/Transformer Transmission Facility Rating |
| NOGRR053 | Synchronization with OGRR226, Generation Resource Response Time Requirement |
| NOGRR054 | Change in Facilitator for the Annual Operations Training Seminar |
| NOGRR055 | Deletion of an Invalid Reference to a Non-Existent NERC Term |
| NOGRR056 | Synchronization with NPRR291, Reduce the Comment Period for NPRRs and SCRs |
| NOGRR057 | Daily Report Containing Loss of Generation Greater than 450 MW |
| NOGRR058 | Deletion of Section 5, Planning |
| NOGRR059 | Administrative Changes for March 1, 2011 Nodal Operating Guides |
| NOGRR060 | Updating the Term Resource Plan to Current Operating Plan |
| NOGRR061 | Posting Requirement for Hydro-Responsive Testing |
| NOGRR062 | Require Voltage Ride-Through Capability for IRRs |
| NOGRR063 | Additional Method for Submitting Back-up Control Plans |
| NOGRR064 | QSE Acknowledgement of VSS Dispatch Instructions |
| NOGRR066 | ERCOT WAN Connection Termination Requirement |
| NOGRR067 | Review and Analysis of Turbine Speed Governor Performance |
| NOGRR068 | Hydro-Responsive Reserve |
| NOGRR069 | Relay Misoperation Reporting Changes for Consistency with ERO-RAPA Proposal |
| NOGRR070 | Synchronization with NPRR356, EEA Changes Related to Dispatch Instructions and BLTs |
| NOGRR071 | Synchronization with NPRR362, Changes to PRC Calculation |
| NOGRR072 | Administrative Changes for June 1, 2011 Nodal Operating Guides |
| NOGRR074 | Clarified Responsible Entities for Reporting Sabotage Information to NERC |
Rejected
| NOGRR075 | Synchronization with NPRR363, Revision to EEA Level 2B ERCOT Requirements During the EILS VDI |
Withdrawn
| NOGRR065 | Authorize ERCOT to Procure Additional RRS During Severe Cold Weather |
| NOGRR073 | Entity Responsible for Load Shed During EEA Level 3 |