NOGRR043
| Title: |
Synchronization with OGRR208,Voltage Ride-Through (VRT) Requirement
|
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved
on 10/07/2010
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
|
10/07/2010
|
TAC
|
To approve NOGRR043 as recommended by ROS in the 9/16/10 ROS Report.
|
Passed
|
|
|
|
09/16/2010
|
ROS
|
To recommend approval of NOGRR043 as recommended by OWG in the 8/18/10 OWG Report and as revised by ROS.
|
Passed
|
|
|
|
08/18/2010
|
OWG
|
Consensus to endorse and forward the 7/21/10 OWG Recommendation Report and the Impact Analysis for NOGRR043 to ROS
|
|
|
|
|
07/21/2010
|
OWG
|
In consensus to recommend approval of NOGRR043 as amended by the 7/8/10 ERCOT comments and as revised by OWG.
|
Passed
|
|
|
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved
|
| Date Posted: |
06/04/2010
|
| Sponsor: |
Warren Lasher
|
| Urgent: |
No
|
| Sections: |
2.9, Voltage Ride-Through Requirements (new) 2.9.1, Additional Voltage Ride-Through Requirements for Wind Generation Resources (new) 3.3, Resource Entities 6.2.5.3.6, Automatic Under-Voltage Load Shedding (UVLS) Protection Systems
|
| Description: |
This Nodal Operating Guide Revision Request (NOGRR) relocates generator voltage requirements from Section 6, Disturbance Monitoring and System Protection, to Section 2, System Operation and Control Requirements, and establishes Voltage Ride-Through (VRT) requirements for Wind Generation Resources (WGRs) to synchronize with the zonal Operating Guides.
Clarifications to Resource Entity responsibilities regarding reactive capability and communication of changes have also been made.
|
| Reason: |
Currently, operational voltage requirements for Resources are embedded in Section 6.2.5.3.6, Automatic Under-Voltage Load Shedding (UVLS) Protection Systems, and wind VRT requirements are omitted.
|
-
(06/04/10, .doc, 133 KB)
-
(06/04/10, .doc, 68 KB)
-
(06/04/10, .doc, 44 KB)
-
(07/08/10, .doc, 94 KB)
-
(07/26/10, .doc, 137.5 KB)
-
(08/19/10, .doc, 139 KB)
-
(08/31/10, .doc, 97.5 KB)
-
(09/13/10, .doc, 97 KB)
-
(09/16/10, .doc, 40.5 KB)
-
(09/17/10, .doc, 148.5 KB)
-
(10/08/10, .doc, 144.5 KB)