| Related Content |
| On this site |
| Operations Working Group |
| On ERCOT sites |
| Nodal Operating Guides |
| On the web |
| PUCT Wholesale Market Oversight (State of the Market Report) |
Operating Guides
The Operating Guides, which supplement the ERCOT protocols, describe the working relationship between ERCOT and the entities within the ERCOT system that interact with ERCOT on a minute-to-minute basis to ensure the reliability and security of the ERCOT system. Specific practices described in the Operating Guides for the ERCOT system are consistent with the North American Electric Reliability Corporation Operating Policies and the protocols.
Operating Guide Revision Request Process
Section 1.3 of the Operating Guides outlines the change control process established to announce, develop, revise and approve the Operating Guides. You may find documents related to Operating Guide Revision Requests (OGRRs) below. Use the OGRR template below to submit a request. Completed OGRRs should be submitted to RevisionRequest@ercot.com.
In This Section
Key Documents
-
Operating Guide Revision Request Form
Form to submit an OGRR to ERCOT
(10/22/07, .doc, 89 KB) -
OGRR Comment Form
Form to submit comments on an OGRR to ERCOT
(10/22/07, .doc, 40.5 KB) -
OGRR Request for Withdrawal Form
(10/22/07, .doc, 36.5 KB)