
ROS Meeting
September 03, 2020
09:30 AM |
Comments
Agenda
Log in and validation for ROS Standing Representatives |
S. Clifton |
9:15 a.m. |
|
1. |
Antitrust Admonition |
K. Bunch |
9:30 a.m. |
2. |
Agenda Review |
K. Bunch |
|
3. |
Approval of ROS Meeting Minutes (Vote) |
K. Bunch |
9:35 a.m. |
July 9, 2020 |
|||
August 6, 2020 |
|||
4. |
Technical Advisory Committee (TAC) Update |
K. Bunch |
9:40 a.m. |
5. |
ERCOT Reports |
9:45 a.m. |
|
Operations Report |
ERCOT Staff |
||
System Planning Report |
P. Yan |
||
Transmission Issues Related to Generation Constraints Workshop Update |
J. Billo |
25 min |
|
System Operating Limits (SOL) Methodology Update |
P. Gnana |
15 min |
|
2020 UFLS Survey Results |
D. Sanchez |
||
6. |
RTCTF Update |
M. Mereness |
10:45 a.m. |
NOGRR211, RTC – NOG 2 and 9: System Operations and Control Requirements and Monitoring Programs |
|||
7. |
System Protection Working Group (SPWG) |
J. Karlik |
10:55 a.m. |
8. |
Urgency Vote(s) (Vote) |
11:10 a.m. |
|
NOGRR218, Removal of Annual Disturbance Monitoring Equipment Database Submission Requirement |
|||
9. |
Performance Disturbance Compliance Working Group (PDCWG) |
C. Mulholland |
11:25 a.m. |
10. |
New Protocol Revision Subcommittee (PRS) Referrals (Vote) |
K. Bunch |
11:35 a.m. |
NPRR1034, Frequency-Based Limits on DC Tie Imports or Exports |
|||
SCR811, Addition of Intra-Hour PhotoVoltaic Power Forecast to GTBD Calculation |
|||
11. |
Revision Requests Tabled at PRS, Referred to ROS (Possible Vote) |
K. Bunch |
11:55 a.m. |
NPRR979, Incorporate State Estimator Standards and Telemetry Standards into Protocols |
|||
12. |
ROS Revision Requests (Vote) |
K. Bunch |
12:05 p.m. |
Impact Analyses |
|||
NOGRR214, Geomagnetic Disturbance (GMD) Measurement Data Reporting |
|||
PGRR077, DC Tie Planning Assumptions |
|||
Language Review |
|||
NOGRR217, Related to NPRR1039, Replace the Term MIS Public Area with ERCOT Website |
|||
PGRR084, Related to NPRR1039, Replace the Term MIS Public Area with ERCOT Website |
|||
(pending Urgency vote) NOGRR218, Removal of Annual Disturbance Monitoring Equipment Database Submission Requirement |
|||
13. |
Revision Requests Tabled at ROS (Possible Vote) |
K. Bunch |
12:20 p.m. |
PGRR073, Related to NPRR956, Designation of Providers of Transmission Additions |
|||
NOGRR199, Related to NPRR979, Incorporate State Estimator Standards and Telemetry Standards into Protocols |
|||
NOGRR210, Related to NPRR1005, Clarify Definition of Point of Interconnection (POI) and Add Definition Point of Interconnection Bus (POIB) |
|||
RRGRR025, Related to NPRR1005, Clarify Definition of Point of Interconnection (POI) and Add Definition Point of Interconnection Bus (POIB) |
|||
NOGRR211, RTC – NOG 2 and 9: System Operations and Control Requirements and Monitoring Programs |
|||
PGRR081, Related to NPRR1026, BESTF-7 Self-Limiting Facilities and Self-Limiting Resources |
|||
NOGRR215, Limit Use of Remedial Action Schemes |
|||
14. |
Operations Working Group (OWG) |
R. Floyd |
12:45 p.m. |
NPRR1001, Clarification of Definitions of Operating Condition Notice, Advisory, Watch, Emergency Notice, and Related Clarifications (Possible Vote) |
|||
NOGRR207, Related to NPRR1001, Clarification of Definitions of Operating Condition Notice, Advisory, Watch, Emergency Notice, and Related Clarifications (Possible Vote) |
|||
15. |
Planning Working Group (PLWG) |
T. Cook |
1:00 p.m. |
PGRR082, Revise Section 5 and Establish Small Generation Interconnection Process |
|||
PGRR083, Add RPG Project Number and TPIT Revisions |
|||
16. |
Combo Ballot (Vote) |
K. Bunch |
1:25 p.m. |
17. |
Network Data Support Working Group (NDSWG) |
J. Yatar |
1:35 p.m. |
18. |
Dynamic Working Group (DWG) |
R. Egunjobi |
1:45 p.m. |
19. |
Operations Training Group (OTWG) |
T. Chilton |
1:55 p.m. |
20. |
Voltage Profile Working Group (VPWG) |
B. Mathew |
2:05 p.m. |
21. |
Other Business |
K. Bunch |
2:15 p.m. |
September 14, 2020 Annual TAC Subcommittee Structural Review 1:30 p.m. |
|||
Review Open Action Items |
|||
No Report: |
|||
Black Start Working Group (BSWG) |
|||
Planning Geomagnetic Disturbance Task Force (PGDTF) |
|||
Steady State Working Group (SSWG) |
|||
Adjourn |
K. Bunch |
2:20 p.m. |
Scheduled ROS Meetings
- Jul 09, 2020 - ROS Meeting
- Aug 06, 2020 - ROS Meeting
- Sep 03, 2020 - ROS Meeting
- Oct 08, 2020 - ROS Meeting by Webex Only
- Nov 05, 2020 - ROS Meeting by Webex Only
- Dec 03, 2020 - ROS Meeting by Webex Only
- Jan 07, 2021 - ROS Meeting by Webex Only
Key Documents
-
APPROVED Minutes ROS 20200903
(Oct 26, 2020 – doc – 231.5 KB) -
ROS Combo Ballot 090320
(Sep 04, 2020 – xls – 108 KB) -
02. Agenda ROS 20200903
(Aug 27, 2020 – docx – 38.1 KB) -
03. Draft Minutes ROS 2020709
(Sep 02, 2020 – doc – 248 KB) -
03. Draft Minutes ROS 2020806
(Sep 02, 2020 – doc – 225.5 KB) -
July 2020 ERCOT Operations Report Public
(Aug 26, 2020 – docx – 812.8 KB) -
SystemPlanningROS July2020 final approved
(Aug 14, 2020 – docx – 513.4 KB) -
05. Transmission Constraints for Generators Workshop WMS ROS Summary
(Aug 27, 2020 – pptx – 86.9 KB) -
05. New SOL Methodology IROL Assessment ROS 09 03 2020
(Sep 02, 2020 – pdf – 245.6 KB) -
05. 2020 ERCOT UFLS Survey Results
(Aug 31, 2020 – pptx – 86.1 KB) -
06. RTCTF ROS Update 20200903
(Sep 02, 2020 – pptx – 165.7 KB) -
07. SPWG Update to ROS 20200903
(Aug 27, 2020 – pdf – 88.3 KB) -
09. PDCWG Report to ROS 090320
(Sep 01, 2020 – pptx – 1.4 MB) -
14. Operations Working Group ROS 20200903
(Sep 03, 2020 – pptx – 36.9 KB) -
MTE 2020 v2 083120
(Sep 03, 2020 – xlsx – 53.2 KB) -
15. PLWG Sep ROS Report 08252020
(Aug 27, 2020 – pptx – 93.2 KB) -
17. NDSWG Report to ROS September2020
(Sep 01, 2020 – pdf – 9.2 KB) -
18. DWG Report to ROS 09032020
(Aug 31, 2020 – pptx – 52.8 KB) -
20. VPWG Report to ROS September 2020
(Sep 02, 2020 – docx – 21.9 KB) -
Meeting Materials ROS 20200903
(Sep 02, 2020 – zip – 7.3 MB) -
Revision Requests ROS 090320
(Sep 02, 2020 – zip – 4 MB)
ROS Standing Representatives intending to vote should join through Webex and have access to their company email.