Electric Reliability Council of Texas (ERCOT)

Texas SET Working Group Meeting

August 19, 2008
10:00 AM - 5:00 PM
RSVP: --
Multiple Day Meeting
ERCOT Austin Room 168
7620 Metro Center Dr.
Austin, TX 78744
Dial-In: 512-225-7290
Dial-In Code: 3716

Agenda

Day 1

 

DAY 1

 

 

 

Texas SET Meeting

 

  • Antitrust Admonition
  • Introductions
  • Approval of the Draft July 2008 Meeting Notes
  • RMS Update
    • RMS Update
    • Review TX SET Update slides presented at RMS on 08-13-2008
    • Any Action Items from RMS in July?   No

   

  • Retail Release Overview from ERCOT
  •     MarkeTrak Phase II

 

 

10:00 AM

 

TX SET issue Updates

 

  • I075:  The use of ignore CSA on a Move-Out where CR is not CSA CR

   ERCOT to Provide Updated Data

  • I077:  Advanced Meter/Master Meter Identifier

            Pending AMIT direction on other potential changes to Retail Transactions

  • I078:  Designate the Ignore Loop for DRG generation outflow (for non-IDR only?)

           Change Control will be drafted pending direction from TAC on handling interval data for DRG <50 KW

  • I080:   New SAC04 Code to identify Energy Efficiency Cost Recovery Factor per new Rule §25.181

 

  • I082: Modify the How to Use pages of the IGs to show how many times a given loop is actually used. 

 

  • I083: Leap-Frog Language in RMG and Stacking Document
  • Issue I079: TDSPs to Receive 814_21 Rejects
    •      Resolved without a change. 
    •       Should this be Withdrawn?

  

 

10:30 AM

 

 Lunch

 

 

12:00 PM

TX SET Issue Updates (continued):

  • I084: Discrepancy in timing for 814_05 -              Draft/Review redlined Transaction Timing                  Matrix (814_05), and

             Draft/Review PRR for 814_05 and 814_06  

             Any Other New Issues?

  •    Need to remove references to Drop to AREP from Stacking Document

 

 

 

1:00 PM

  The Future of Implementation Guide Examples

  • Review list of examples created by ERCOT (Kathryn Thurman) with actual data.
  • Update master matrix of Examples to Keep

 

 

 2:00 PM

Safety-Net RMGRR066:  

  • Consider a concern raised by TXU Energy and potentially file comments on the RMGRR from TX SET 

 

 2:30 PM

 

Retail Market Guide Clean-up for v3.0

  • Continue review of assigned sections of the Retail Market Guide:
  •         7.3 Safety Net – Bill Reily   Completed
  •         7.4 Standard Historical Usage Request  Completed
  •         7.5 Transfer from Outgoing Provider of Last Resort (POLR) to Incoming POLR upon Termination of POLR Status  Completed
  •         7.6 Disconnect and Reconnect for Non Payment Process Completed
  •         7.7 Transaction Timing Matrix   K. Thurman  Pending
  •         7.8 Formal Dispute Process for CRs and TDSPs  Completed
  •         7.9 No Retail Electric Provider of Record or Left in Hot Completed
  •         7.10 867_03 Contingency  Completed
  •         7.11 Mass Transition   Completed
  •         7.12 Estimated Meter Reading  Completed
  •         7.13 Interval Data Recorder (IDR) Optional Removal/Install Process  Completed

 

 

 

3:00 PM

Update Action Items Spreadsheet: 

 

4:00 PM

 

Adjourn for the Day

 

4:30 PM


Day 2

 

DAY 2

 

 

 

Advanced Metering Implementation Team:  

 

    • Discussion of a Standard Timeline Required for TX SET Releases – ERCOT
    • Roundtable Discussion of Potential Issues to consider with regard to changes in Retail Transactions and Business Processes resulting from Advanced Metering networks and a common TDSP Web Portal.
    • AMIT and potential impacts to TX SET
    • Interim Solution for Settlement of AMS Meters – MARS Task Force Created    
    • AMIT Meetings;
      • August: No Meetings
      • September: 3: Kick-off of Retail Transactions Project
      • September : 16-18, 22-23, 29-30

 

 9:00 AM

2008 TX SET Meeting Schedule and Locations

 

 

11:45 AM

 

Adjourn

 

12:00 PM

 


Key Documents